Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T15CM00967
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/13/2015 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
02/13/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide exhaust for the fitting rooms. Reference: Section 403.3, IMC 2012. |
02/13/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
02/13/2015 | ROBERT SHERRY | WATER | REVIEW | Completed | |
02/13/2015 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET C-100; BUILDING CODE DATA: THE PLAN INDICATES THE CODE REQUIREMENTS FOR MAXIMUM TRAVEL DISTANCE TO EXIT, MAXIMUM DEAD END CORRIDOR LENGTH, MINIMUM CORRIDOR WIDTH, MINIMUM EGRESS PATH WIDTH, AND MINIMUM EXIT DOOR CLEAR OPENING WIDTHS. PLEASE LIST THE ACTUAL VALUES FOR EACH. 2. SHEET D-100 ( DEMOLITION PLAN); SHEET A-100 (CONSTRUCTION PLAN): A NOTE NEAR THE RESTROOM INDICATES THE GENERAL CONTRACTOR IS TO VERIFY FIXTURES ARE ADA COMPLIANT. THIS IS NOT THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PLEASE REVIEW AND VERIFY. 3. SHEET D-100; DEMOLITION PLAN: A NOTE IN THE BUILDING INTERIOR INDICATES THE GENERAL CONTRACTOR IS TO VERIFY THE EXISTING CONDITIONS REGARDING EXISTING MECHANICAL, ELECTRICAL, AND PLUMBING. THIS IS NOT THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PLEASE REVIEW AND VERIFY. 4. SHEET A-200; REFLECTED CEILING PLAN: THERE ARE NOTES INDICATING THE GENERAL CONTRACTOR IS TO PROVIDE BLOCKING AS REQUIRED. THIS IS NOT THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PLEASE REVIEW AND VERIFY. 5. SHEET A-501; SECTIONS 1 AND 2: A NOTE BELOW THE CEILING INDICATES NEW METAL STUDS AS REQUIRED. PLEASE SPECIFY THE STUD SIZE AND SPACING ON THE SECTIONS. 6. SHEET P-100; WATER HEATER DETAIL: A NOTE INDICATES THE PLUMBING WALL FRAMING IS SPACED AT 16" O.C., WHILE A NOTE BELOW INDICATES TO SECURE METAL STUDS TO THE WALL AT 2'-0" O.C. PLEASE CLARIFY. 7. SHEET P-100; WATER HEATER DETAIL: A NOTE INDICATES TO PROVIDE 2X4 METAL STUD BACKING ON THE WALL. IS THIS A METAL OR WOOD STUD? PLEASE VERIFY. 8. SHEET P-100; WATER HEATER DETAIL: THE BLOCKING BETWEEN STUDS IS INDICATED AS STEEL BUT SHOWN AS WOOD. PLEASE CLARIFY. 9. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
02/13/2015 | RSHERRY1 | WWM | REVIEW | Passed | No water meter size change. |
02/13/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Clarify the construction notes on the water heater detail. The studs are 16" OC but the attachments are 24" OC. The studs and backing elements are steel but the attachments appear to be for wood. 2. Provide complete plumbing plans that show the extent of the work being done, including piping diagrams for the supply, waste, and vent piping. 3. Is the existing water heater being replaced? If so, show the installation of an ASSE 1070-listed mixing valve for the lavatory. 4. Show the size, route and termination of the T&P relief piping for the water heater. 5. Provide insulation and heat traps for the water heater. |
02/13/2015 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
02/13/2015 | MARTIN BROWN | FIRE | REVIEW | Approved | |
02/13/2015 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/03/2015 | KROBLES1 | OUT TO CUSTOMER | Completed |