Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T15CM00830
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/09/2015 | DAVID RIVERA | ZONING | REVIEW | Approved | |
02/09/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide calculations demonstrating adequate ventilation using the current code. Reference: Section 403.2, IMC 2012. 2. Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restrooms will be exhausted during occupied hours. Reference: Section 403.2.1 (4), IMC 2012. 3. Revise the font size used on sheet M3 to a minimum height of 3/32-inch. Reference: Section 107.2.1, IBC 2012. |
02/09/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Font size Plan Sheet E.4 cannot be less than 3/32" .This includes lower case. |
02/09/2015 | ROBERT SHERRY | WATER | REVIEW | Completed | |
02/09/2015 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
02/09/2015 | RSHERRY1 | WWM | REVIEW | Passed | No water meter size change. |
02/09/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide an approved vacuum relief valve on the cold water supply for the water heater. Reference: Sections 303.2 and 502.1, IPC 2012. 2. Tempered water for the lavatories is required in the restrooms using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012. 3. Provide automatic faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson. |
02/09/2015 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
02/09/2015 | RONALD BROWN | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
04/30/2015 | KROBLES1 | FIRE | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/30/2015 | KROBLES1 | OUT TO CUSTOMER | Completed |