Permit Number: T15CM00420
Parcel: 117042400

Address:
529 N 6TH AV

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T15CM00420
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/18/2015 JASON GREEN ENGINEERING REVIEW Approved
08/19/2015 STEVE SHIELDS ZONING REVIEW Approved
08/19/2015 KEN BROUILLETTE FIRE REVIEW Approved
08/20/2015 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please provide the following information:
#1. Compliance with IECC for lighing, and the Tucson Outdoor Lighting Code.
#2. Provide complete electrical plans for Power and Lighting, Service Equipment, load calc's, for the entire property, per NEC, not IRC.
Ref: IBC sec. 107.2.1, IECC sec C405, NEC.
08/20/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Comment not addressed. [Second comment: N1104.1, shown on sheet A6, is a section in the IRC.] [Initial comment: Remove all notes that refer to the IRC (e.g. Section R303.3, IRC 2012 is not applicable; the International Mechanical Code is the controlling code.)]
2. Comment not addressed. Note that only the addition must comply with the envelope requirements of the 2012 IECC. [Second comment: No COMcheck analysis was found in this submittal. The "model energy code" approach shown on sheet A2 has not been used since 2003.] [Initial comment: Demonstrate energy code compliance for the addition to the building envelope using calculations based on the current code (i.e. provide a COMcheck analysis of the envelope addition). Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012.
3. Comment not addressed. [Second comment: Comment not addressed.] [Initial comment: Provide NFRC fenestration product ratings for the U-factor and the SHGC values for the doors and windows on COMcheck or use the appropriate default U-factor and SHGC values from Tables C303.1.3 (1), C303.1.3 (2) and C303.1.3.(3), IECC 2012. Factory-manufactured windows are required to have certificates attesting to their compliance to NFRC Standards 100 and 200 and can be provided by the manufacturer or found at www.nfrc.org. Reference: Section C303.1.3, IECC 2012.]
4. Comment not addressed. [Second comment: Comment not resolved. Provide calculations to show that operable windows or doors will provide a minimum of 4% of the room area.] [Initial comment: Provide calculations to show how ventilation will be provided for the occupied spaces. Reference: Section 401.2, IMC 2012.]
5. Comment not addressed. [Second comment: Comment not resolved. Provide a sequence of operation that will result in all of the air supplied to the restroom being exhausted during occupied hours.] [Initial comment: No exhaust fan is shown in the restroom; provide the sequence of operation for the restroom exhaust fan to show that all of the air supplied to the restroom will be exhausted during occupied hours. Reference: Section 403.2.1 (4), IMC 2012.]
08/20/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. The backflow preventer is still called out as 1-1/4" on the plans and as 2" in the water pressure calculations. [Second comment: Clarify the size of the backflow preventer; the size is noted as being 2", 1-1/4", ¾", and ½".] [Initial comment: Show the location of the reduced pressure backflow assembly on the drawings; indicate the size of the assembly. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, http://www.tucsonaz.gov/files/water/docs/backflow-ordinance.pdf]
2. Comment not addressed. [Second comment: Comment not addressed; requiring all fixtures to be "per the 2012 IPC" is not a fixture description.] [Initial comment: Provide fixture descriptions for all plumbing fixtures. Reference: Section 402, IPC 2012 and Section 107.2.1, IBC 2012.]
3. Comment not addressed. [Second comment: Comment not addressed.] [Initial comment: Verify the pressure drop at the water meter, the water pressure range, and the static lift for the water supply. Correct the arithmetic used to calculate the pressure available for friction.]
4. The waste and vent riser diagram is still not coordinated with the plans. In addition, the fixture drain from the clothes washer shall connect to a fixture branch that is at least 3" in size per Section 406.2, IPC 2012; a 3" cleanout will also be required. [Second comment: Comment not addressed. [Initial comment: Coordinate the waste and vent riser diagram with the plumbing floor plan. Reference: Section 107.2.1, IBC 2012.]
08/20/2015 ROBERT SHERRY WATER REVIEW Completed
08/21/2015 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEET A1; NEW LAYOUT PLAN: THE LANDING AT THE EXTERIOR STAIR DOES NOT MEET THE REQUIREMENTS OF THE IBC SECTION 1009.8 FOR THE SIZE OF THE LANDING REDUCTION DUE TO THE DOOR OPENING. PLEASE REVISE.
2. SHEET A1; NEW LAYOUT PLAN: IS THE 'BOTTLE-LESS' WATER COOLER INDICATED NEAR THE BREAK ROOM A SINGLE POINT-OF-USE WATER DISPENSER AS ALLOWED BY THE CITY OF TUCSON (CONNECTED DIRECTLY TO THE WATER LINE WITH NO DRAIN REQUIRED)? PLEASE VERIFY AND INDICATE CUPS ARE LOCATED AT AN ACCESSIBLE HEIGHT.
3. SHEET A1; PLANS: PLEASE PROVIDE A NORTH ARROW ON THE PLANS.
4. SHEET A3; NOTES: THE FIRST NOTE (STRUCTURAL LUMBER), SECOND NOTE (NAILING), THIRD NOTE (GYPSUM BOARD), AND A SEPARATE NOTE (WINDOW HEADERS) ALL REFERENCE IRC TABLES AND SECTIONS. PLEASE REVISE.
5. SHEET A3; FOUNDATION AND FRAMING PLANS: ALL DETAILS SHOULD REFERENCE SHEET A4 (INDICATES 1/6, 2/6, 3/6, AND 4/6).
6. SHEET A4; SECTION A: DETAILS 2 AND 3 SHOULD BE REVERSED.
7. SHEET A4; DETAIL 1: PLEASE INDICATE THE MASONRY WALL THICKNESS.
8. SHEET A5; NORTH ELEVATION: THE ELEVATION INDICATES FOUR WINDOWS ON THE NORTH WALL, WHILE THE PLAN INDICATES THREE. PLEASE CLARIFY.
9. GENERAL: PLEASE PROVIDE A DETAIL OF THE EXISTING STAIR INDICATING RISER HEIGHTS, TREAD WIDTHS, HANDRAILS, LANDING DIMENSIONS, AND STAIR DIMENSIONS.
10. GENERAL: PROVIDE THE SHEARWALL SCHEDULE ON THE DRAWINGS AND IDENTIFY THOSE WALLS ON SHEET A3.
11. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
08/21/2015 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Approved