Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T15CM00375
Parcel: 11202005A

Review Status: Completed

Review Details: RESUBMITTAL - TI ALL

Permit Number - T15CM00375
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/02/2015 KEN BROUILLETTE FIRE REVIEW Reqs Change 1. Please change plans to indicate the proposed locations of portable fire extinguishers.
2. Please indicate on the plans that a manual fire alarm system will be installed per 1103.7.6 as the Fire Code Official is requiring these buildings to comply with the 2012 IFC Chapter 11.
04/10/2015 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. PREVIOUS COMMENT 1: THIS COMMENT PERTAINED TO THE 2012 IEBC. PER SECTIONS 3404 AND 3412 OF THE 2012 IBC, ALTERATIONS DO NOT REQUIRE THE EXISTING BUILDING TO BE MORE COMPLIANT OR MORE SAFE THAN THE EXISTING STRUCTURE. SECTION 3411.7(1) DOES REQUIRE UP TO 20% OF THE PROJECT COST BE APPLIED TO ALTERATIONS AFFECTING THE AREA OF PRIMARY FUNCTION. PLEASE INCLUDE ON THE DRAWINGS THAT AMOUNT, HOW IT IS BEING APPLIED, AND THE PERCENTAGE THAT IT REPRESENTS.
2. PREVIOUS COMMENT 2: TO A CERTAIN DEGREE, YOU ARE CORRECT. WE WILL ASSUME THERE ARE VERTICAL FIRE SEPARATION WALLS AS REQUIRED, THERE ARE HORIZONTAL FIRE ASSEMBLIES AT THE FLOORS AND ROOF, AND SMOKE DETECTION/FIRE ALARM SYSTEMS. ALL OF THESE ARE REQUIREMENTS OF THE IBC SECTION 420. WE CAN ASSUME THE STRUCTURAL ANALYSIS INCLUDED WITH THIS PROJECT MEETS THE REQUIREMENTS OF THE IBC SECTIONS 3404 AND 3405. PLEASE INCLUDE ON ALL OF THE BUILDING PLANS THE LOCATION OF THE FIRE SEPARATION WALLS, THE CONSTRUCTION OF THOSE WALLS (AND THE HORIZONTAL ASSEMBLIES), AND HOW THOSE WALLS AND HORIZONTAL ASSEMBLIES ARE TO BE REPAIRED IF DAMAGED DURING CONSTRUCTION OR IF BREACHED BY MECHANICAL, PLUMBING, OR ELECTRICAL ALTERATIONS. INCLUDE REPAIR MATERIALS (GYPSUM BOARD, FIRE CAULK, ETC.) ALONG WITH HOW THESE MATERIALS ARE TO BE INSTALLED (PER THE MANUFACTURER). THIS WILL ASSIST INSPECTORS IN IDENTIFYING WHERE REPAIRS ARE REQUIRED AND HOW THE REPAIRS MUST BE INSTALLED.
3. GENERAL: PLEASE INCLUDE THE GROUND AND THIRD FLOOR PLANS IN THE DRAWINGS.
4. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
04/16/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
04/16/2015 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved