Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T15CM00372
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/02/2015 | KEN BROUILLETTE | FIRE | REVIEW | Reqs Change | 1. Please change plans to indicate the proposed locations of portable fire extinguishers. 2. Please indicate on the plans that a manual fire alarm system will be installed per 1103.7.6 as the Fire Code Official is requiring these buildings to comply with the 2012 IFC Chapter 11. |
04/10/2015 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. PREVIOUS COMMENT 1: THIS COMMENT PERTAINED TO THE 2012 IEBC. PER SECTIONS 3404 AND 3412 OF THE 2012 IBC, ALTERATIONS DO NOT REQUIRE THE EXISTING BUILDING TO BE MORE COMPLIANT OR MORE SAFE THAN THE EXISTING STRUCTURE. SECTION 3411.7(1) DOES REQUIRE UP TO 20% OF THE PROJECT COST BE APPLIED TO ALTERATIONS AFFECTING THE AREA OF PRIMARY FUNCTION. PLEASE INCLUDE ON THE DRAWINGS THAT AMOUNT, AND THE PERCENTAGE THAT IT REPRESENTS. 2. PREVIOUS COMMENT 2: TO A CERTAIN DEGREE, YOU ARE CORRECT. WE WILL ASSUME THERE ARE VERTICAL FIRE SEPARATION WALLS AS REQUIRED, THERE ARE HORIZONTAL FIRE ASSEMBLIES AT THE FLOORS AND ROOF, AND SMOKE DETECTION/FIRE ALARM SYSTEMS. ALL OF THESE ARE REQUIREMENTS OF THE IBC SECTION 420. WE CAN ASSUME THE STRUCTURAL ANALYSIS INCLUDED WITH THIS PROJECT MEETS THE REQUIREMENTS OF THE IBC SECTIONS 3404 AND 3405. PLEASE INCLUDE ON ALL OF THE BUILDING PLANS THE LOCATION OF THE FIRE SEPARATION WALLS, THE CONSTRUCTION OF THOSE WALLS (AND THE HORIZONTAL ASSEMBLIES), AND HOW THOSE WALLS AND HORIZONTAL ASSEMBLIES ARE TO BE REPAIRED IF DAMAGED DURING CONSTRUCTION OR IF BREACHED BY MECHANICAL, PLUMBING, OR ELECTRICAL ALTERATIONS. INCLUDE REPAIR MATERIALS (GYPSUM BOARD, FIRE CAULK, ETC.) ALONG WITH HOW THESE MATERIALS ARE TO BE INSTALLED (PER THE MANUFACTURER). THIS WILL ASSIST INSPECTORS IN IDENTIFYING WHERE REPAIRS ARE REQUIRED AND HOW THE REPAIRS MUST BE INSTALLED. 3. PREVIOUS COMMENT 8: A NOTICE HAS BEEN ADDED TO THE SIGNAGE SCREEN. THIS MUST BE SUBMITTED UNDER A SEPARATE PERMIT TO SIGNS BEFORE IT CAN BE REVIEWED AND APPROVED. 4. SHEET A2: PLEASE PROVIDE THE GROUND AND THIRD FLOOR PLANS IN THE DRAWINGS. 5. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
04/16/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
04/16/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
04/16/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed |