Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T15CM00250
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/05/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
08/11/2015 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET S2.01 (FOOTING SCHEDULE); STRUCTURAL CALCULATIONS: THE CALCULATIONS FOR COLUMN FOOTING F18.5 INDICATES A 18'-6" X 6'-0" X 30" FOOTING, WHILE THE SCHEDULE ON SHEET S2.01 INDICATES A 18'-6" X 5'-9 X 2'-6 FOOTING. PLEASE CLARIFY. 2. GENERAL: PLEASE PROVIDE A WRITTEN RESPONSE TO THE COMMENT. |
08/14/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | #1. Please indicate feeder conductor material (copper or aluminum ), insulation types for all feeders shown on the one line diagram plan sheet E4.1. Please verify that the feeder conductor sizes and types are sufficient for loads and overcurrent protection as shown for panels 'PPA' and 'PPB'. Plan Sheet E4.1, E5.1, E5.2. Ref; IBC sec. 107.2.1, NEC art. 240, 310.15 B 16, |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/03/2015 | EGALLET1 | APPROVAL SHELF | Completed |
09/03/2015 | EGALLET1 | OUT TO CUSTOMER | Completed |
09/03/2015 | EGALLET1 | REJECT SHELF | Completed |