Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T15CM00203
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/12/2015 | CPIERCE1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
01/13/2015 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
01/23/2015 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
01/30/2015 | ROBERT SHERRY | WATER | REVIEW | Completed | |
01/30/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The International Plumbing Code, 2012, as amended by the City of Tucson is the controlling plumbing code for this activity, not the California Plumbing Code as stated in note G of the General Notes on sheet P-302. Reference: Section 101, IBC 2012. 2. Provide a direct connection to the building drainage system for all plumbing fixtures except as allowed by Chapter 8, IPC 2012. Reference: Section 301.3, IPC 2012. 3. Provide calculations showing how the water supply piping has been sized. Show how the new water piping relates to the existing water supply system and show that the additional connections do not cause the existing piping to be overloaded. Reference: Sections 604.1 and 604.3, IPC 2012 and Section 107.2.1, IBC 2012. 4. Detail 04/P-401 is incorrect (the use of an island vent is restricted to sinks and lavatories) but does not appear to be used in this activity. Remove the detail from the plans. Reference: Section 916.1, IPC 2012. 5. Provide a vent downstream of the gravity grease separator to protect the seal for the grease separator. (A vent upstream of the gravity grease interceptor is not required.) Reference: Section 1003.9, IPC 2012. |
01/30/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
02/04/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | #1. Please provide the following information on electrical plans as required per, NEC 110.3, 408.4, IBC 107.2.1, and city of Tucson Plan Submittal requirements. ( a) Panel schedules. (b)Lighting and power circuit designation to corresponding panels. (c) Load calculations at associated panelboards. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/13/2015 | SHANAE POWELL | OUT TO CUSTOMER | Completed |
02/13/2015 | CPIERCE1 | REJECT SHELF | Completed |