Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T14PI00012
Parcel: Unknown

Address:
3200 N ORACLE RD

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T14PI00012
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/06/2015 GARY WITTWER DOT LANDSCAPE REVIEW Approved
02/04/2015 JOSE ORTIZ DOT TRAFFIC REVIEW Denied Project in ADOT right-of-way, need approval letter from ADOT for signage, striping and overall plan review.

Lucy Inzunza
2/04/2015
02/04/2015 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied PROJECT NAME: QUIK TRIP STORE #1464
PLAN #: U-2014-022
ACTIVITY NUMBER: T14PI00012
PROJECT REVIEWER: Ernie Encinas, City of Tucson Streets & Traffic Maint.

The City of Tucson Streets & Traffic Maint. Division - Electric Shop has completed the review of the PIA plan and recommends denial at this time. The following comments need to be addressed in the subsequent plan submittal. Please return redlined drawins with next submittal and reference PIA activity number on all correspondences.

See redlines on plans, conflict with street lighting system.

If you have any questions, I can be reached at 791-3154 or Ernie.Encinas@tucsonaz.gov.
02/17/2015 RICHARD LEIGH DOT ENGINEERING REVIEW Denied Oracle Road at Fort Lowell Road
Offsite Improvement for Quiktrip 1464
Plan No. U-2014-022
First submittal - Engineering
Reviewer - Craig Saltzman 837-6621
Bus Pullout - Oracle Road.
1) Sht. 3 of 11 Change bay width from 14 ft. to 12 ft.
2) C.O.T. requires 12 ft. of P.C. C. pavement from curb face for bus pullout.
3) Extent P.C.C. pavement 1 ft. past the break pt./ gutter line.
4) Investigate moving catch basins out of bus pullout (maintenance issue).
5) Truncate P.C.C. paving at beginning of transition. COT has found the small wedge area at the beginning of a bus pullout taper to be a maintenance issue.
6) Bus shelter pad and landing dimensions (length 20 ft. , width 10ft. 6 inches, pad thickness 6 inches)
7) Bus shelter pad and landing shall be located within the R/W.
8) Check with Sun Trans for location of pad (bus stacking).
9) Remove ½ inch skin patch between existing asphalt and P.C.C. P. bus pullout (1/2 inch finish course will be a maintenance issue with the buses, pullout and stopping at the pullout). Replace with full depth asphalt section - 2 inches mix no. 3 (3/8 inch stone) on 8 inches mix no. 1 (3/4 inch stone) on compacted sub base. Saw cut, match existing elevation, tack and join.
10) Profile
Sidewalk
1) All public sidewalks along Forte Lowell Rd. and Oracle Rd. shall be in the R/W. If public sidewalk is located on private property need to dedicate R/W.
2) All public sidewalks shall be 6 ft. wide.

3) All public access ramps shall be located within R/W. If not need to dedicate R/W.
Sht. 3 of 11
1) Remove- Pavement Structural Section No. 2 ( COT does not use a 1/2 inch lift when milling and overlaying. 2 inches is iminium lift used by City).
2) Likewise modify Pavement Structural Section No. 1 to have a finish course of 2 inches.
Sht. 5 of 11
1) Investigate abandonment of R/W (private sign) midway into spandrel on the NE corner.
Sht. 9 of 11
1) Remove painted non-standard crosswalk across driveway

Lighting
1) Need lighting plans (conduit run, pole locations, pull boxes, and existing conduit).
2) Light pole at approx. Sta 95+00 shown on private property - need easement or R/W.
3) Light pole symbols need to be turned 180 degrees (face toward roadway).
Storm Sewer
1) As stated under Bus Pullout comments: Investigate moving catch basins out of bus pullout
2) Sta 96+37.77 remove sump catch basin. Replace with interceptor type basin or move sump onto private property. Safety issue.
3) Need Profile
4) Storm Sewer Manhole on Ft. lowell - locate manhole within Public R/W
Fort Lowell Rd. need plans for work in the public R/W.
02/18/2015 LINZUNZA PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
02/18/2015 LINZUNZA PIA COORDINATOR OUT TO CUSTOMER Completed
12/24/2014 LINZUNZA UTILITY CLEARANCES COT STREETS DIVISION Denied
12/24/2014 LINZUNZA UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied
12/24/2014 LINZUNZA UTILITY CLEARANCES PC WASTEWATER MGMT Denied
12/24/2014 LINZUNZA UTILITY CLEARANCES QUEST COMMUNICATION Denied
12/24/2014 LINZUNZA UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied
12/24/2014 LINZUNZA UTILITY CLEARANCES COX COMMUNICATION Denied
12/24/2014 LINZUNZA UTILITY CLEARANCES SOUTHWEST GAS CORP Denied
12/24/2014 LINZUNZA UTILITY CLEARANCES EL PASO NATURAL GAS Denied
12/24/2014 LINZUNZA UTILITY CLEARANCES KINDER MORGAN ENERGY Denied