| 01/06/2015 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Approv-Cond | January 06, 2015 SUBJECT: Vail Christian Church PROJECT REVIEWER: Simon Ramos, EIT, Traffic Engineering, City of Tucson DOT The Signing and Striping Section has completed the reviewed of the PIA plan and recommends a conditional approval of signing and striping plans. The following comments need to be addressed prior to submittal of the mylar plan set for signatures. 1. Include/complete the plan number "I-2014-010" in the title block of each sheet. 2. Include Development Services Department PIA activity number "T14PI00010 on cover sheet. 3. On page 3 of 4, EDIT Striping and Signing Notes as per red -lines. 4. On page 3 of 4, both "R3-5F" signs are to be on top of "R3-5R" signs. 5. On page 3 of 4, REMOVE all "R1-1" signs. 6. On page 3 of 4, ADD "No Left Turn" sign, "R3-5R" sign, and PVC post as per red-lines. 7. On page 3 of 4, ADD street names on plan. Please Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6678 or Simon.Ramos@tucsonaz.gov Simon Ramos, E.I.T. Engineering Associate Traffic Engineering Department of Transportation |
| 01/07/2015 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
| 01/07/2015 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | More time is needed for review. |
| 01/07/2015 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
| 12/01/2014 | LINZUNZA | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
| 12/01/2014 | LINZUNZA | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
| 12/01/2014 | LINZUNZA | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
| 12/01/2014 | LINZUNZA | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
| 12/01/2014 | LINZUNZA | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
| 12/01/2014 | LINZUNZA | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
| 12/01/2014 | LINZUNZA | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
| 12/01/2014 | LINZUNZA | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
| 12/01/2014 | LINZUNZA | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
| 12/16/2014 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approv-Cond | It appears that there is no landscape or irrigation within the ROW. Correct? Detail Fon sheet 4 of 4. We do not want this area for landscaping, please concrete in the porkchop. |
| 12/30/2014 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | Comments by Craig Saltzman, 520-837-6621 Craig.Saltzman@tucsonaz.gov 1) Sht. 4 of 4 AC Paving Section Use 2' Mix #3 0n 2' Mix #1 on 8 1/2 " ABC See Interim Structural Section Sht. 2 of 37 I-87-021 Valencia Rd. (Phase I) Kolb Rd. to Houghton RD. (attached) Pg. 4 Vail Christian Church : Soils Report Compressive properties 1st paragraph second sentence: "However, at increased moisture contents we expect that the soils will exhibit moderate additional compression or collapse." 2) Sht. 4 of 4 West Entrance Detail A. Add 6 ft. wide pedestrian access w/curb across traffic island. B. Change 6 inch type vertical curb to 8 inch 3) Sht. 4 of 4 Thickened Edge A. 9 inch thickness change to 12 inch B. 12 inch width change to 24 inches 4) sht 4 of 4 West Entrance A. Storm Sewer MH and pipe relocate both to be within City R/W B. Existing design 24" RCP 90 degrees to 38" X 24" HERCP - Address Angle of Confluence 100 yr Q 24 RCP =97 cfs 100 yr Q main line 24 RCP up stream of MH =27 cfs Exist 24 RCP is a lateral joining the main line 38 X 24 HERCP using a MH The angle of confluence needs to addressed see the following from Storm Sewer Design Manual Reference Storm Sewer Design Manual Section 4. "Angle of confluence, A , shall be less than or equal to 45 degrees w/ 45 degrees perfered except that A shall be less than 30 degrees for the following: a) Q in greater than 10 percent of Q mainline. b) Qin has velocity greater than 20 fps. c) Diameter (d) of laternal is 60 inches or more." |