Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T14PI00009
Parcel: Unknown

Address:
4426 E 22ND ST

Review Status: Completed

Review Details: PIA - RESUBMITTAL

Plan Number - T14PI00009
Review Name: PIA - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/13/2015 GARY WITTWER DOT LANDSCAPE REVIEW Completed
01/13/2015 LINZUNZA UTILITY CLEARANCES COT STREETS DIVISION Completed
01/13/2015 LINZUNZA UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
01/13/2015 LINZUNZA UTILITY CLEARANCES PC WASTEWATER MGMT Completed
01/13/2015 LINZUNZA UTILITY CLEARANCES QUEST COMMUNICATION Completed
01/13/2015 LINZUNZA UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
01/13/2015 LINZUNZA UTILITY CLEARANCES COX COMMUNICATION Completed
01/13/2015 LINZUNZA UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
01/13/2015 LINZUNZA UTILITY CLEARANCES EL PASO NATURAL GAS Completed
01/13/2015 LINZUNZA UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
01/27/2015 RICHARD LEIGH DOT ENGINEERING REVIEW Approv-Cond The TDOT Permit Review Section has reviewed the PIA Plan and recommends a conditional approval. The following comments need to be addressed prior to submitting the mylar plan set for final approval.

Sheet 2: Detail 4 and 5, indicate on detail the proposed asphalt mix No. per Standard Specifications 406.
01/29/2015 LINZUNZA PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
01/29/2015 JOSE ORTIZ DOT TRAFFIC REVIEW Approved January 29, 2015

PROJECT NAME: Chapman Automotive East
PLAN #: I-2014-009
ACTIVITY NUMBER: T14PI00009
PROJECT REVIEWER: Simon Ramos, EIT, Traffic Engineering, City of Tucson DOT

The Signing and Striping Section has completed the reviewed of the PIA plan and recommends approval at this time. The following comments need to be addressed in the subsequent plan submittal. Please return redlined drawings with next submittal and reference PIA activity number on all correspondences.

If you have any questions, I can be reached at 837-6678 or Simon.Ramos@tucsonaz.gov
01/29/2015 LINZUNZA PIA COORDINATOR OUT TO CUSTOMER Completed
01/29/2015 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied SUBJECT: Chapman Automotive East, Offsite Improvement Plans - T14PI00009

PROJECT REVIEWER: James Femling, Streets & Traffic Maint. Division

RESUBMITTAL REQUIRED: The TDOT Streets and Traffic Maintenance Division has reviewed the PIA Plan and recommeds resubmittal. The following comments need to be addressed prior to submitting the mylar plan set for final approval.

1. Sheet 2 - Crack seal new joint. Typical at all cuts.

2. Sheet 4 Extend sidewalk to property line.

3. Please refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 791-3154 or James.Femling@tucsonaz.gov