Plan Number: T14PI00004
Parcel: Unknown

Review Status: Completed

Review Details: PIA - RESUBMITTAL

Plan Number - T14PI00004
Review Name: PIA - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/12/2014 LINZUNZA UTILITY CLEARANCES COT STREETS DIVISION Denied
06/12/2014 LINZUNZA UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied
06/12/2014 LINZUNZA UTILITY CLEARANCES PC WASTEWATER MGMT Denied
06/12/2014 LINZUNZA UTILITY CLEARANCES QUEST COMMUNICATION Completed
06/12/2014 LINZUNZA UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied
06/12/2014 LINZUNZA UTILITY CLEARANCES COX COMMUNICATION Completed
06/12/2014 LINZUNZA UTILITY CLEARANCES SOUTHWEST GAS CORP Denied
06/12/2014 LINZUNZA UTILITY CLEARANCES EL PASO NATURAL GAS Denied
06/12/2014 LINZUNZA UTILITY CLEARANCES KINDER MORGAN ENERGY Denied
06/13/2014 GARY WITTWER DOT LANDSCAPE REVIEW Approved
06/13/2014 RICHARD LEIGH DOT ENGINEERING REVIEW Approv-Cond Prior to submitting mylars for signature, please include the following information on the plan cover sheet.

1. Indicate the recordation information (Book and Page) for the subdivision.

2. Provide a note Stating that the roadway infrastructure improvements are per Annexation Case No. XXXXXXX
06/16/2014 JOSE ORTIZ DOT TRAFFIC REVIEW Denied PLANS # i-2014-003
ACTIVITY NUMBER: T14PI00004
PROJECT NAME: Ghost River Ranch
PROJECT ADDRESS: 3303 N Bear Canyon Rd Tucson Az
PROJECT REVIEWER: Matthew Geweke, Traffic Eng. Tech

Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. Please email me a pdf so that we can expedite these minor corrections.
The following items must be revised or added to the plan. Please include a response letter with the next submittal that states how all comments have been addressed and resubmit the original redline set of plans for back checking purposes.

- The "City Limits" have changed, please indicate new limits on cover sheet.
(this will prevent future confusion)

- Please try to place the "NP" signs on property line to avoid driveway conflicts and to not place in front of home view. Okay to place signs every 2nd property lot line.

- STOP bars are WS12

- "Trailblazer Way" within the notes is incorrect.

- Please add the second half of the obliteration note to Sht 4 Note 16 (see attached) to the Striping Notes.

- Please make all suggested corrections to Signing Notes on Sht 4

- Please note signs sizes for the signing subcontractor.

- Bike lane begins at ECR/PT

- Only 50' of WG6 needed

Please do email me at Matthew.Geweke@tucsonaz.gov with a PDF of redlines and the corrected Shts with the revisions of these requested changes so we can expedite the Traffic Eng. acceptance/approval of these plans.

I can also be reached at 791-4259 x76665 with any questions.
Thank you
06/27/2014 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approved
07/14/2014 LINZUNZA PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Denied
07/14/2014 LINZUNZA PIA COORDINATOR OUT TO CUSTOMER Denied