Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T14OT01299
Parcel: 137054390

Review Status: Completed

Review Details: FLOODPLAIN

Permit Number - T14OT01299
Review Name: FLOODPLAIN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/21/2014 JASON GREEN ENGINEERING REVIEW Reqs Change DATE: October 22, 2014
SUBJECT: 858 W Nebraska Street- Engineering Review
TO: Rick Young
REVIEWERS: Jason Green, CFM
ACTIVITY: T14CM06930 and T14OT01299

SUMMARY: Engineering Division of Planning & Development Services Department has received and reviewed the site plan application, Floodplain Use Permit and Hydrology/Hydraulic Analysis for the above referenced property and does not recommend approval of the site plan at this time.

The subject property is located within a mapped regulatory 100-year floodplain per the submitted Hydrology/Hydraulic Analysis the following information is required prior to site plan approval:

SITE PLAN:

1) TC 26-11.a: Revise the site plan to provide a note that states; "All proposed fencing and walls will require a separate permit for review and approval by all necessary Planning & Development Services Departments. Any proposed walls or fencing will be reviewed for compliance with Chapter 26 Floodplain and Erosion Hazard Ordinance; a separate Floodplain Use Permit will be required for any new wall or fence permit for the subject property."

2) TC 26-11.a: Revise the site plan to provide a note that states; "This project is affected by the City of Tucson Floodplain Regulations, subject property is located within a mapped 100-year floodplain per the Hydrology/Hydraulic Analysis prepared by Sturm Wasser Engineering, LLC dated October 02, 2014."

3) TC 26-11.2.a.1: Revise the site plan to label and dimension the 100-year floodplain limits, 50-foot erosion hazard setback, water surface elevation with datum reference, top of bank, etc. It is acknowledged that a Hydrology Plan was submitted as supplemental information however it is not included as part of the plan set and there are multiple discrepancies including dimensions from property lines between each plan. The site plan must show all the required information and be sealed and signed by an Arizona Registered Civil Engineer or at a minimum the Site Plan and Hydrology Plan Sheets should match in dimensions and elevations and the Hydrology Plan Sheet should be included as part of the plan set and the sheet count should be revised to reflect 11 Sheets.

4) TC 26-11.2.a.2.b: Revise the site plan to provide the estimated cut and fill quantities. Show the method of elevation for the proposed single family residence. If fill is used for elevating the finish floor of the residence the building line must be located not less than 25-feet landward from any edge of fill, unless a study prepared by a state-registered professional civil engineer and approved by the City engineer shows that a lesser distance is acceptable and that rock-rip rap or other form of erosion protection is provided.

5) TC 26-11.2.a.2.b: Revise the site plan and all associated cross sections, structural foundation sheets and elevation sheets to clearly label and dimension the method of elevation and all construction aspects for the proposed single family residence. Each sheet needs to call out the minimum finished floor elevation to the specific NAVD88 datum reference as per the Hydrology/Hydraulic Analysis.

6) TC 26-11.2.a.2.b: Revise the Building Height Section under the Site Notes to verify the new building heights once the plan set has been revised to reflect the correct method of elevation and the correct finish floor elevation.

7) TC 26-11.2.h: Revise the site plan to provide a note that states; "Elevation Certificates are required for the new single family residence and must be returned to the City of Tucson Planning & Development Services Department, Engineering Section for conformance review prior to the pouring of the 1st slab and prior to the final inspection." Both a Prior to Slab and a Prior to Final hold will be placed on these permits for the single family residence until the required Elevation Certificates are returned and show conformance with the set conditions.

8) TSM Sec.4-02.2.5.A: Revise the site plan to label and dimension the regulated areas (50-foot study area, erosion hazard setback, 100-year floodplain) on the plan in a surveyable manner. The plan shall also indicate the proposed location of the temporary fencing which is required to protect the protected riparian areas during construction.

9) TSM Sec.4-02.2.5.A.2: Revise the site plan sheet to indicate the top of bank and the 50-foot study area of the W.A.S.H. wash adjacent to the site. It is acknowledged that per the referenced section that there is no encroachment into the regulated area however the information is still required to be shown and labeled correctly.

HYDROLOGY/HYDRAULIC ANALYSIS:

10) TSM Sec.4-04.2.3.1.3.B.2: Revise the Hydrology/Hydraulic Analysis to clarify the Exhibits used in the Analysis. Exhibit 3 seems to be the only one referenced correctly. Provide a reference to the FEMA FIRM Panel used (Exhibit 5 per the ordering), provide the referenced aerial photo that is called out under Section 3.2 as Exhibit 2, and clarify what would be, per the ordering, Exhibit 4. Exhibit 4 does not match either the proposed site plan or the Hydrology Plan that was included with the submittal. Per TSM Sec.4-04.2.3.1.1.G the Analysis should include a Table of Content that has all report pages numbered sequentially and it should include all exhibits and appendices that are within the Analysis.

11) TSM Sec.4-04.2.3.1.2.C.1: Revise the Hydrology/Hydraulic Analysis and Section 4.1 to provide a discussion on the Watercourse Amenities, Safety and Habitat (W.A.S.H.) wash adjacent to the site. The discussion should provide reference to Chapter 29 of the Tucson Code and to the Technical Standard Manual Section 4-02 and clearly state exceptions that may apply to the site. Per the prepared Analysis and the delineated 100-year floodplain limits along with the applicability under Chapter 29 Sec.29-14.b.1 the W.A.S.H. requirements do not apply and the Analysis should reference these exceptions.

12) TSM Sec.4-04.7.6.1: Revise the Hydrology/Hydraulic Analysis and Section 4.2 to provide the calculation used for the 27-foot EHSB as stated. It is acknowledged that the Analysis is proposing to setback the minimum 50-feet per the W.A.S.H. study area however the Analysis should still provide a discussion on the equation used and the calculation that determined the calculated 27 feet as stated in the Section.


GENERAL COMMENTS:

Please provide the revised site plan and Hydrology/Hydraulic Analysis that address the comments provided above.

For questions or to schedule a meeting I can be reached at 837-4929.


Jason Green, CFM
Senior Engineer Associate
Engineering Division
Planning & Development Services Department