Permit Number: T14CM08988
Parcel: 12312085A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T14CM08988
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/06/2015 MARTIN BROWN FIRE REVIEW Denied Please provide occupant load for new AND existing spaces, and a total for the building.
Please provide an occupant load for the fellowship hall/class room and verify direction of door swing is approvable by the building department.
Please provide a north arrow for each sheet of the plans.
01/12/2015 RONALD BROWN BUILDING-COMMERCIAL REVIEW Reqs Change GENERAL COMMENTS
1. Provide complte building code analysis including the existing building.
2. Provide an exiting plan and show exist, travel distance and common path of egress travel calculations for both existing and new.
3. Provide a complete set of structural calculations including:
a. Foundation plan and key plan
b. Roof Framing plan and key plan
c. Floor framing and key plan
d. Lateral analysis plus key plan
e. Lintel and beam schedules
f. Roof top mountaed HVAC analysis
g. Provide an existing structural analysis of all members supporting the new second floor addition, this includes all bearing walls and existing foundations.
4. Provide an accurate occupancy load calculation and analysis showing each occupancy use calculation: i.e. assembly table and chairs, assembly chairs only, stage, classroom, business offices and first and second level totals.
5. Provide larges scale stair details showing all accessibility requirements such as dimensions, width minimums, handrails, treads and risers, landings, clarances, slopes and etc.
6. Provide a large scale second level toilet plan elevations showing all accessibile requirements such as dimensions, accessories, toilet fixtures, clearances, signage, and etc.
7. Provide panic hardware on all doors as required by the 2012 IBC, Section 1008.1.10.
8. As per section 903.2.1.3 of the 2012 IBC, with an occupant load pf 300 or more, this building must be sprinklered.
SHEET 2
9. Provide demolition notes to this plan showing the scope of semolition.
10. Identify all existing and new building elements with line weight, symbols and notes.
11. The second level stair is non-compliant:
a. As per section 1009.1, the maximum rise of a stair without a landing is 12'-0". This stair is at 12'-8".
b. Reference section 1009.4 of the 2012 IBC for the minimum with of 44" with an occupant load of 50 or more.
c. Two exit stairs are required for a 2nd level assembly/education facility. Reference 2012 IBC, Section 1020, 1021 and 1022.
12. Provide an accurate second level occupant load analysis and plumbing fixture count as per table 2902.1.
13. Provide 2 drinking fountains as per the 2012 IBC, Section 1109.5 and the 2009 ICC A117.1, Section 602.5 and the 2012 IBC, Table 2902.1.
14. Provide one service sink.
END OF REVIEW
14.
01/13/2015 MICHAEL ST. PAUL ZONING REVIEW Reqs Change Approval of DP14-0249 is required.
01/14/2015 RONALD BROWN COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
01/23/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. The City of Tucson has adopted the 2012 International Codes but the 2012 International Residential Code is not appropriate for this activity. Revise all code references to show the correct code and the correct code edition.
2. Provide water supply isometrics. Reference: Section 107.2.1, IBC 2012.
3. The term "private" for plumbing fixtures applies to fixtures that are located in a residence or apartment, non-public toilet rooms in hotels or motels, and are intended for the use of a family or an individual. All of the plumbing fixtures in the church appear to be for public use; revise the water demand calculations using fixture units for public fixtures (see Table E103.3 (2), 2012 IPC). Include all fixtures when calculating the total demand and determining pipe sizes. Reference: Sections 202 and 604.3, IPC 2012.
4. Verify that all of the minimum plumbing facilities required by Table 2902.1 and Section 2902.2, IBC 2012, for places of worship (A-3 occupancy) have been provided.
5. Provide material standards for all plumbing fixtures being provided by others. Reference: Sections 303.4 and 402, IPC 2012.
6. Provide automatic faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson.
7. Provide tempered water for the lavatories in the restrooms using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012.
8. Provide the specifications and listing information for the proposed water heater. Reference: Sections 303.2 and 501.5, IPC 2012 and Section 107.2.1, IBC 2012.
9. Type M copper tubing is not the same as Schedule 40 copper pipe. Reference: Table 605.4, IPC 2012.
10. Horizontal branches shall connect no closer than ten diameters downstream of the bases of vertical stacks. Reference: Section 704.3, IPC 2012.
11. Determine the size of the waste water pipes using the fixture units shown in Table 709.1. The maximum number of fixture units for a horizontal branch (not a building drain) shall not exceed that shown in Table 710.1 (2), IPC 2012.
12. Provide a cleanout at the base of each waste stack. Reference: Section 708.3.4, IPC 2012.
13. Provide the rim elevation of the next upstream sanitary manhole and the first floor elevation. Determine the need for a backwater valve per Section 715.1, IPC 2012, as amended by the City of Tucson. If a backwater valve is required, verify that no fixtures located more than 12" above the rim elevation of the next upstream manhole (i.e. fixtures on the second floor) discharge through the backwater valve. Reference: Section 715.1, IPC 2012.
14. Show that each trap and trapped fixture has been vented in accordance with one of the methods shown in the IPC. Reference: Section 901.2.1, IPC 2012.
15. Clarify the design of the church roofs. Sheet 10 of 18 shows pitched roofs but notes the presence of parapets and roof drains and details 7, 8, and 10 on sheet 9 of 18 also show parapets.
01/23/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide energy code compliance calculations for the additions to the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the additions to the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012.
2. Show how the "Additional Efficiency Package Requirements" noted in Section C406, IECC 2012 is to be addressed. Reference: Section C401.2, IECC 2012.
3. Provide NFRC fenestration product ratings for the U-factor and the SHGC values on COMcheck or use the appropriate default U-factor and SHGC values from Tables C303.1.3 (1), C303.1.3 (2) and C303.1.3.(3), IECC 2012. Reference: Section C303.1.3, IECC 2012.
4. Show that the proposed HVAC system meets the requirements of Sections C403.2, C403.3 and, if neither the efficient lighting system nor the on-site renewable energy options are selected, C406.2, IECC 2012 (e.g. provide the mechanical energy code compliance certification from COMcheck). Reference: Section C303.1, International Energy Conservation Code 2012.
5. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012.
6. The minimum seasonal energy efficiency rating (SEER) of each air conditioning unit shall comply with the requirements of Table C403.2.3, IECC 2012. Reference: Section C403.2.3, IECC 2012.
7. Show that each rooftop unit has a thermostatic control that provides for off-hour and set-back control, automatic shutdown and start-up control and, if the control does not require manual changeover from the heating and cooling modes, restricts set point overlap. Reference: Section C403.2.4, IECC 2012.
8. Provide automatic shutoff dampers for the outdoor air supply and exhaust ducts. Reference: Section C403.2.4.4, IECC 2012.
9. The minimum insulation for ducts located within unconditioned spaces shall be R-6 with a minimum separation of R-8 between the duct and the exterior of the building. Reference: Section C403.2.7, IECC 2012.
10. Show that the rooftop equipment is being installed in accordance with the conditions of its listing and the manufacturer's installation requirements. Reference: Section 304.1, IMC 2012.
11. Show how adequate access is being provided for the equipment located on the roof. Reference: Section 306.5, IMC 2012.
12. Show the size, routing, and termination of the condensate drains. Reference: Section 307.2.1, IMC 2012 as amended by the City of Tucson.
13. Revise the airflow data for the restroom exhaust fans and provide information on their sequence of operation to show that all of the air supplied to the restrooms will be exhausted. Reference: Section 403.2.1 (4), IMC 2012.
14. Provide calculations demonstrating adequate ventilation using the current code. Reference: Section 403.2, IMC 2012.
15. Provide a Type I or Type II hood (e.g. a Type I hood is required for the gas range) over all commercial cooking or heat-producing appliances. Reference: Sections 507.1 and 507.2, IMC 2012.
16. Revise the mechanical design as required to avoid using the corridor as a return air duct. Reference: Section 601.2, IMC 2012.
01/23/2015 ROBERT SHERRY WATER REVIEW Completed
01/30/2015 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change #1. Please provide a complete fault current analysis, fuse size and type for service equip.
#2. Please provide compliance with IECC.
D Santa Cruz
Elect. Plans Examiner
520-837-4995

Final Status

Task End Date Reviewer's Name Type of Review Description
02/03/2015 SHANAE POWELL OUT TO CUSTOMER Completed
02/03/2015 CPIERCE1 REJECT SHELF Completed