Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM08934
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/02/2015 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 01/13/2015 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET G000.A; PROJECT SUMMARY: REFERENCE IS MADE TO THE IBC TABLE 503 FOR CONSTRUCTION TYPE. THE CONSTRUCTION TYPE SHOULD REFERENCE THE IBC CHAPTER 6, WHILE TABLE 503 IS FOR ALLOWABLE BUILDING HEIGHTS AND AREAS. 2. SHEET G000.A; PROJECT SUMMARY: REFERENCE IS MADE TO THE IPC TABLE 4-1 FOR REQUIRED PLUMBING FIXTURES. REVISE THE REFERENCE TO TABLE 403.1 OF THE IPC OR TABLE 2902.1 OF THE IBC. 3. SHEET G000.A; PROJECT SUMMARY: THE OCCUPANT LOAD CALCULATION INDICATES 200 SF/PERSON FOR THE OCCUPANCY DETERMINATION. PER THE IBC TABLE 1004.1.2, USE AN ALLOWABLE SF/OCCUPANT OF 100. REVISE THE DRAWING. 4. SHEET G000.A; PROJECT SUMMARY: INCLUDE IN THE PLUMBING CALCULATIONS THE REQUIREMENTS FOR DRINKING FOUNTAINS (HIGH/LOW OR SINGLE POINT OF USE) AND THE SERVICE SINK. 5. SHEET G000.A; PROJECT SUMMARY: THE PROJECT SCOPE INDICATES THE REMODEL OF AN EXISTING SPACE TO ACCOMMODATE A NEW OFFICE. PROVIDE IN THE DRAWINGS AN EXISTING FLOOR PLAN. 6. SHEET G000.B; EXIT CALCULATION TABLE; CODE PLAN: THE OCCUPANT LOAD INDICATED IN THE TABLE IS 48. IT APPEARS WE ARE ADDING ROOM A101, ROOM A102, TOILETS A103 AND A104, HALL A105, ROOM A106, ROOM A107, AND HALL A108. VERIFY THE SCOPE OF THIS PROJECT AND COORDINATE THE TOTAL OCCUPANT LOAD TO THAT SHOWN ON SHEET G000.A. 7. SHEET G000.B; EXIT CALCULATION TABLE; CODE PLAN: THE PLAN INDICATES 43 OCCUPANTS EXITING AT DOOR E-1, AND 5 OCCUPANTS EXITING AT DOOR E-2. THE EXIT CALCULATION TABLE INDICATES 24 OCCUPANTS EXITING AT DOOR E-1 AND E-2. COORDINATE. 8. SHEET G002.A; DETAIL 17: INDICATE ON THE DETAIL THE MAXIMUM SPOUT HEIGHT FOR THE ACCESSIBLE DRINKING FOUNTAIN, AND THE MINIMUM/MAXIMUM SPOUT HEIGHT FOR STANDING PERSONS PER THE ICC/ANSI A117.1 SECTION 602. 9. SHEET G002.A; DETAIL 17: INDICATE ON THE DETAIL THE MINIMUM DISTANCE FROM THE WALL TO THE SPOUT AND THE MAXIMUM DISTANCE FROM THE SPOUT TO THE FRONT EDGE OF THE DRINKING FOUNTAIN PER THE ICC/ANSI A117.1 FIGURE 602.5. 10. SHEET G002.B: ADD A VERTICAL GRAB BAR ON THE SIDE WALL OF THE WATER CLOSET PER THE ICC/ANSI A117.1 FIGURE 604.5.1. 11. SHEET G0002.B: INDICATE ON THE TOILET PLAN THE SIZE OF CLEARANCE FOR THE WATER CLOSET PER THE ICC/ANSI A117.1 FIGURE 604.3. 12. SHEET A101; FLOOR PLAN GENERAL NOTES: NOTE 4 REFERENCES SHEETS A400-A403. THERE IS NO SHEET A403. REVISE NOTE. 13. SHEET A101; PARTIAL FLOOR PLAN: PROVIDE A NORTH ARROW ON THE PLAN. 14. SHEET A101; PARTIAL FLOOR PLAN: INDICATE THE SERVICE SINK ON THE PLAN, OR PROVIDE A NOTE ON THE DRAWING INDICATING AN EXISTING SERVICE SINK WILL BE USED. 15. SHEET A101; FLOOR PLAN KEY NOTES: NOTES 3.6, 3.7, AND 14.12 WERE NOT LOCATED ON THE PLAN. VERIFY. 16. SHEET A111; REFLECTED CEILING PLAN KEYNOTES: NOTE 1.1 WAS NOT LOCATED ON THE PLAN. VERIFY. 17. SHEET A400: THERE ARE MANY ELEVATION KEYNOTES LISTED ON THIS SHEET THAT ARE NOT SPECIFIC TO THIS PROJECT. REMOVE THOSE NOTES AS REQUIRED. 18. SHEET A402; EDUCATION ROOM PLAN: THE ELEVATION INDICATOR REFERENCES 20/A402, WHILE THOSE ELEVATIONS ARE TITLED AS 19. REVISE. 19. SHEET A510; DETAIL 21B: INDICATE THE KICKER SIZE AND SPACING (OR REFERENCE DETAIL 9B). 20. SHEET A510; DETAIL 2 (INTERIOR METAL STUD SCHEDULE): THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE. 21. GENERAL: IS THERE ANY DEMOLITION OF EXISTING WALLS, FIXTURES, OUTLETS ETC. INCLUDED IN THIS PERMIT? PROVIDE DRAWINGS FOR THAT DEMOLITION AS REQUIRED. 22. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 01/20/2015 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 01/20/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. If the manufacturer does not incorporate a sediment trap within the gas-fired equipment, provide a sediment trap downstream of the appliance shut off valve, as close to the equipment as possible. Reference: Section 408.4, IFGC 2012. 2. Verify that the developed length of the hot water supply piping is no greater than fifty feet or provide a method for maintaining the temperature of the hot water supply system. Reference: Section 607.2, IPC 2012. |
| 01/21/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Ventilation calculations for HVAC systems supplying multiple zones shall take into account the different occupancy loads in each zone. Reference: Section 403.3.2.3, IMC 2012. 2. The portion of the building shell being modified in this activity does not appear to previously have been conditioned. Section C101.4.5, IECC 2012 requires the space to be brought into full compliance with the current energy code as if it was new construction. Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012. 3. Provide NFRC fenestration product ratings for the U-factor and the SHGC values on COMcheck or use the appropriate default U-factor and SHGC values from Tables C303.1.3 (1), C303.1.3 (2) and C303.1.3.(3), IECC 2012. Reference: Section C303.1.3, IECC 2012. 4. Provide heating and cooling load calculations that justify the capacity of the A/C unit that has been stored on the roof. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. |
| 01/26/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Approval subject to subsequent review due to potential mechanical changes. D Santa Cruz, Elect. Plans Examiner 520-837-4995 |
| 12/29/2014 | AROMERO4 | WWM | REVIEW | Completed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/02/2015 | SHANAE POWELL | OUT TO CUSTOMER | Completed |
| 02/02/2015 | CPIERCE1 | REJECT SHELF | Completed |
| 01/28/2015 | CPIERCE1 | APPROVAL SHELF | Completed |