Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T14CM08192
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/26/2015 | RONALD BROWN | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
01/26/2015 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
01/29/2015 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
02/09/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not addressed; cleanouts for the canopy storm drains are shown on the civil plan C120 but they are not sufficient. [Initial comment: Provide a cleanout at the base of each vertical rainwater leader prior to connection to the horizontal storm drain below grade. Reference: Sections 708.3.4 and 1101.8, IPC 2012.] 2. Comment not addressed; the canopy storm drains are shown on the civil plan C120 and the pipe material shall be changed to comply with Section 1102.3, IPC 2012. Note that approved development plans are not to be used for construction of on-site utilities (e.g. water service to buildings, building sewer, building storm drains, site lighting, or electrical service to the buildings). The construction of the on-site utilities may be included with the permit for constructing the building. [Initial comment: The storm drain pipe proposed for use under the fuel canopy (PVC SDR 35) does not conform to one of the standards listed in Table 702.2, IPC 2012. Reference: Section 1102.3, IPC 2012.] |