Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T14CM08184
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/02/2014 | CPIERCE1 | ZONING | REVIEW | Reqs Change | SEE COMMENTS UNDER T14CM07567 |
12/02/2014 | CPIERCE1 | ENGINEERING | REVIEW | Reqs Change | SEE COMMENTS UNDER T14CM07567 |
12/03/2014 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
12/03/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET FSC1; BUILDING CODE SUMMARY (NUMBER OF EXITS): THE IBC SECTION 1501.1 AND TABLE 1501.1 ARE REFERENCED FOR THE NUMBER OF EXITS. REVISE THE REFERENCE NUMBERS TO THE 2012 IBC. 2. SHEET FSC1; BUILDING CODE SUMMARY (COMMON PATH OF TRAVEL): THE IBC TABLE 1004.3 IS REFERENCED FOR THE COMMON PATH OF TRAVEL. REVISE THE REFERENCE NUMBER TO THE 2012 IBC. 3. SHEET FSC1; BUILDING CODE SUMMARY (OCCUPANCY LOAD CALCULATION TABLE): THE TABLE INDICATES 23 OCCUPANTS, WHILE A STATEMENT BELOW THE TABLE INDICATES 21. CLARIFY. 4. SHEET FSC1; BUILDING CODE SUMMARY (PLUMBING FIXTURE COUNTS): THE IPC SECTION 403.2 IS REFERENCED FOR THE PLUMBING FIXTURE COUNTS. ADD THE REFERENCE NUMBER FOR THE 2012 IBC PLUMBING FIXTURE COUNT. 5. SHEET FSS0; FOUNDATION PREPARATION: THE LAST PARAGRAPH REFERENCES A GEOTECHNICAL REPORT BY MIDWEST TESTING. WAS THERE ANOTHER GEOTECHNICAL REPORT IN ADDITION TO THE REPORT RECEIVED FROM TERRACON? CLARIFY. 6. SHEET FSS0; GENERAL NOTES: PROVIDE A NOTE THAT THE FUEL STATION STRUCTURAL STEEL CANOPY IS A DEFERRED SUBMITTAL AND WILL MEET THE REQUIREMENTS OF THE IBC SECTION 107.3.4.1. 7. SHEET FSS1; FOUNDATION PLAN: AT THE UPPER LEFT COLUMN FOOTING, PROVIDE THE EAST/WEST DIMENSION. 8. SHEET FSS1; FOUNDATION PLAN: PROVIDE A NORTH ARROW ON THE PLAN. 9. SHEET FSS1; DETAIL 2: ON DETAIL 2, THE FOOTING SIZE INDICATES 9'-0" X 7'-0" UNLESS NOTED OTHERWISE (SEE PLAN FOR ORIENTATION). EIGHT OF THE TEN COLUMN FOOTINGS ARE DEPICTED AS SQUARE, SO THERE IS NO CLEAR ORIENTATION. CLARIFY EACH FOOTING SIZE AND ORIENTATION. 10. STRUCTURAL CALCULATIONS: ARE THE CALCULATIONS FOR THE SERVICE BUILDING FOUNDATION INCLUDED IN THIS SUBMITTAL? VERIFY. 11. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
12/05/2014 | KEN VAN KARSEN | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | T14CM08184 1. 2012 IECC (interior) lighting calculation: provide ComCheck report, or Table C405.5.2(1) building area or (2) space-by-space for budget determination. 2. City of Tucson Outdoor Lighting Code (Ord #10963) compliance: Compare total fixture output to the budget based on property size and zone location (Table 401.1). a. Include all exterior (existing) fixtures within the property lines. The ordinance requires identification of each fixture type (both Full-Cut-Off and un-shielded); and fixture output based on a typical lamp lumen output at the maximum fixture wattage rating. Include landscape fixtures in the existing total and determine the qualified option limit. b. The rated color temperature of proposed fixtures shall not exceed 3500K, Section 402. Notate plans, or provide manufacturer spec sheet with color temperature rating. The 2012 Outdoor Lighting Code may be found on The City of Tucson Website under: www.tucsonaz.gov/pdsd; Codes, Standards, Ordinances & Guidelines; Building Codes. Ken Van Karsen Electrical Plan Review PDSD, City of Tucson 520-837-4906 Kenneth.VanKarsen@tucsonaz.gov |
12/24/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a detail for mounting the water heater shelf along with structural calculations to show that the water heater is safely supported. Reference: Section 301.2, IPC 2012. 2. Verify that the automatic faucet for the lavatory will be set to dispense a maximum of 0.25 gallons per metering cycle. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson. 3. At a minimum, beverage dispensers require the use of a backflow preventer that is listed to ASSE 1022. Reference: Section 608.16.10, IPC 2012. 4. Provide roof drainage calculations and plans for the fuel canopy. Provide overflow protection for the canopy. Reference: Sections 1101, 1106 and 1108, IPC 2012. |
12/24/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Demonstrate energy code compliance for the building envelope using calculations based on the current code. Reference: Sections C101.3, C101.5, and C103.2, International Energy Conservation Code 2012. 2. Provide NFRC fenestration product ratings for the U-factor and the SHGC values on COMcheck or use the appropriate default U-factor and SHGC values from Tables C303.1.3 (1), C303.1.3 (2) and C303.1.3.(3), IECC 2012. Reference: Section C303.1.3, IECC 2012. 3. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. 4. Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restroom will be exhausted (i.e. the exhaust fan shall run whenever the building is occupied). Reference: Section 403.2.1 (4), IMC 2012. 5. Provide calculations to show how ventilation will be provided for the occupied spaces. Reference: Section 401.2, IMC 2012. 6. Secure the refrigerant circuit access ports of the condensing unit to prevent unauthorized access. Reference: Section 1101.10, IMC 2012. |
12/24/2014 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide the location of the water meter and backflow preventer associated with the water meter serving this fuel station. Reference: Section 107.2.1, IBC 2012. |
12/29/2014 | MARTIN BROWN | FIRE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/16/2015 | CPIERCE1 | REJECT SHELF | Completed |