Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T14CM08052
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/14/2015 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 04/23/2015 | RONALD BROWN | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
| 04/23/2015 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approv-Cond | The detailing concerning the stair is insufficient for a code review. Provide the manufacturer's shop drawings as a deferred submittal and insure all required detailing is provided; handrails, connection to building detail, foundation detail, handrails, guards, landings, dimensions and etc. |
| 04/27/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide overflow protection for the roof. See Sections 1108.2 and 110-8.3, IPC 2012. [Initial comment: Provide roof drainage and hydraulic scupper size calculations based on the 100-year hourly rainfall rate for Tucson, 3" per hour. Provide overflow protection for the roof. Reference: Sections 1106.1, 1106.4, and 1108.3, IPC 2012.] 2. New comment: drawing PS-1, Plumbing Site Plan, has not been sealed. |
| 04/27/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Clarify the construction of the roof, floor, and exterior walls for the residence. Keynote 18, A7 calls out R-30 batt insulation for the roof cavity and keynote 65, A7 calls out 1" rigid insulation board above the roof sheathing (R 5); detail 3/A13 calls for R 37 foam insulation in the roof cavity; the COMcheck analysis shows R 40.4 cavity insulation plus R 18.2 continuous insulation. On sheets A7 and A13, the floor of the residence is shown with R 19 batt insulation (keynote 61, A7) with 1" rigid insulation board above the floor sheathing (R 5); COMcheck however calls out R 28.9 cavity insulation along with R 14.6 continuous insulation. On sheets A7 and A13, the exterior walls are shown as being constructed of 8" CMU with steel furring, R 13 cavity insulation and 1" rigid insulation board (R 5) between the steel furring and the gypsum boards but COMcheck shows the walls as being steel-framed, 16" o.c. with R 21.4 cavity insulation and R 13.6 continuous insulation. [Initial comment: Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012.] |
| 04/28/2015 | MICHAEL ST. PAUL | ZONING | REVIEW | Reqs Change | Approval of DP14-0216 required. Building plans must match the final approval plans for the development package. |
| 04/29/2015 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Reqs Change | Bldg plan can not be approved until TSMR is approved, and Development Package DP14-0216 is resubmitted and approved. |
| 04/30/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/01/2015 | AROMERO4 | OUT TO CUSTOMER | Completed |