Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T14CM07871
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/20/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 11/28/2014 | DAVID RIVERA | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera Principal Planner PROJECT: DP14-0211 3420 N. Craycroft Road Development Package - Site Grading Erosion Protection Plan TRANSMITTAL DATE: November 28, 2014 DUE DATE: December 17, 2014 COMMENTS: Zoning conditionally approves the Erosion Protection Walls Permit pending approval of the Development Package.If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. |
| 12/08/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET S2 (SECTION A); GEOTECHNICAL EVALUATION (PAGE 24); STRUCTURAL CALCULATIONS (PAGE 2): THE GEOTECHNICAL EVALUATION AND THE STRUCTURAL CALCULATIONS INDICATE WALL SECTION A HAS 19' OF FREEBOARD AND 16' OF WALL EMBEDMENT, WHILE SECTION A/S2 INDICATES 16' OF FREEBOARD AND 16' OF WALL EMBEDMENT. CLARIFY. 2. SHEET S2 (SECTION C); GEOTECHNICAL EVALUATION (PAGE 24); STRUCTURAL CALCULATIONS (PAGE 2): THE GEOTECHNICAL EVALUATION AND THE STRUCTURAL CALCULATIONS INDICATE WALL SECTION C/S2 HAS 18' OF FREEBOARD AND 12' OF WALL EMBEDMENT, WHILE SECTION C/S2 INDICATES 15' OR 16' OF FREEBOARD AND 12' OF WALL EMBEDMENT. CLARIFY. 3. SHEET S2; SECTION C: THE WEST FREEBOARD DIMENSION INDICATES 115'-0". REVISE. 4. SHEET S2; WALL SECTION C: THE SECTION INDICATES TWO DIFFERENT WALL HEIGHTS (27'-0" AND 28'-0"). INDICATE ON THE WALL PLAN ON SHEET S1 WHERE THAT TRANSITION OCCURS. 5. SHEET S3 (SECTION E); GEOTECHNICAL EVALUATION (PAGE 24); STRUCTURAL CALCULATIONS (PAGE 2): THE GEOTECHNICAL EVALUATION AND THE STRUCTURAL CALCULATIONS INDICATE WALL SECTION E HAS 14' OF FREEBOARD AND 14' OF WALL EMBEDMENT, WHILE SECTION E/S3 INDICATES 13' OF FREEBOARD AND 14' OF WALL EMBEDMENT. CLARIFY. 6. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 12/17/2014 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Reqs Change | permit may not be issued until floodplain use permit is approved/issued. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/22/2014 | AROMERO4 | OUT TO CUSTOMER | Completed |