Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T14CM07612
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/05/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | SHEET A2 1. Please define the existing roof decks and membraine systems used on all buildings and covered breezeways. a. For all metal roof systems please provide flashing details at parapet wall abuttments and valley edges of new crickets and etc. 2. Are you really draining the east side of the office buildng on the mechanical units? Reference mechanical/plumbing comments. CALCULATIONS 3. Provide an utlimate wind design load of 115 mpg. END OF REVIEW |
| 12/05/2014 | KEN BROUILLETTE | FIRE | REVIEW | Completed | |
| 12/11/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Clarify how the rainwater from the roof areas will be directed away from the buildings. Reference: Section 1101.2, IPC 2012. 2. Provide roof drainage and hydraulic scupper size calculations based on the 100-year hourly rainfall rate for Tucson, 3" per hour. Include the effect of any vertical walls that can divert rainfall onto the roof. Show all dimensions for the roof scuppers and the downspouts. Reference: Sections 1106.1, 1106.4, and 1108.3, IPC 2012. 3. Provide secondary (overflow) roof drainage. Reference: Sections 1101, 1106 and 1108, IPC 2012, and Sections 1611.1 and 1611.3, IBC 2012. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/15/2014 | FERNE RODRIGUEZ | APPROVAL SHELF | Completed |
| 12/15/2014 | FERNE RODRIGUEZ | OUT TO CUSTOMER | Completed |
| 12/15/2014 | CPIERCE1 | REJECT SHELF | Completed |