Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T14CM07592
Parcel: 127081910

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T14CM07592
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/06/2015 SPOWELL1 WWM REVIEW Needs Review
12/16/2014 KEN VAN KARSEN ELECTRICAL-COMMERCIAL REVIEW Completed
12/16/2014 ROBERT SHERRY WATER REVIEW Reqs Change Verify that an approved reduced pressure backflow prevention assembly will be installed at the water meter.
12/16/2014 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Comment not addressed. [Initial comment: Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Show how the "Additional Efficiency Package Requirements" noted in Section C406, IECC 2012 is to be addressed. Reference: Section C401.2.1, IECC 2012.Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012.]
2. Comment not addressed. [Initial comment: Provide NFRC fenestration product ratings for the Solar Heat Gain Coefficient (SHGC) on COMcheck or use the appropriate default SHGC from Table C303.1.3 (2), IECC 2012. Coordinate the SHGC values shown on the COMcheck Envelope Compliance Certificate with the window descriptions shown on the drawings. Reference: Section C303.1.3, IEC 2012.]
3. The HVAC system described in the submitted Mechanical Compliance Certificate does not match the unit shown on the plans. The unit shown on the plans has a cooling total capacity of 116 MBH, not the 7 MBH on the Mechanical Compliance Certificate. RTU-1 does not have a specified EER but apparently has a gas-heating section that has 100% efficiency. [Initial comment: Show that the proposed rooftop units meet the requirements of Sections C403.2.2, C403.2.3, C403.2, and C403.3 (e.g. provide the mechanical energy code compliance certification from COMcheck). Reference: Section C303.1, International Energy Conservation Code 2012.]