Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM07504
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/17/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | GENERAL 1. The north arrows on all the plans are drawn 180 degrees out. Please reconcile. This includes the exterior elevation orientations as well. SHEET G1.0 2. Change your occupant load to the number of fixtures available in each toilet room. (total of 12) SHEET A1.0 3. As per the 2012 IBC, Table 602, if the building separation distance from the property line is less than 10', the parallelling walls must be 1 hour fire rated. a. Please provide the dimensions showing the separation of the building to the property for both the south and west exterior walls. Fire rate these walls as required. 4. Please define what is being stored under the adjacent open storage shed, identify it's occupancy classification and verify if the east exterior wall of the toilet has to have a fire rated separation as per the 10212 IBC, Table 508.4. SHEET A.20 5. Provide water dispensers as required by the 2012 IBC, Section 1109.2.2, and 2009 ICC A117.1, Section 602. SHEET A3.0 6. At elevation 3, provide at least one sink at 2'-10" a.f.f. SHEET 4.0 7. Verify the wall sections orientation. 8. Show the 1 hour rating assembly as required. SHEET M2.1 9. Where is the specification for WH-2? END OF REVIEW |
| 11/26/2014 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Revise the site plan to show the location of the existing water meter and the proposed water service line for the new restroom building. Reference: Section 107.2.1, IBC 2012. |
| 11/26/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the site plan to show the location and dimensions of the proposed septic system, including the primary and reserve leach fields. Dimension the clearances of the proposed sewage treatment system from property lines, wells, water lines, and other sewage treatment systems. Reference: City of Tucson Administrative Manual, Section 2-06.4.8D and Section 107.2.1, IBC 2012. 2. Add water heater WH-2 to the plumbing fixture and equipment specifications. Reference: Section 107.2.1, IBC 2012. 3. Provide sufficient information to show that the installation of the new plumbing fixtures will not cause the existing water supply system to become overloaded. Reference: Section 107.2.1, IBC 2012. 4. Show how the water in the exposed pipes for the emergency eyewash will be kept in the required "tepid" temperature range (60°-100°F). Reference: ANSI standard Z358.1-2009. 5. Show how the exposed water pipes are to be protected from freezing. Reference: Section 305.4, IPC 2012. 6. Provide overflow protection for the roof. The "overflow" opening shown on detail 7/A3.0 will not provide overflow protection for the roof if the primary drain (the scupper) is blocked. Reference: Sections 1101, 1106 and 1108, IPC 2012, and Sections 1611.1 and 1611.3, IBC 2012. |
| 11/26/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012. 2. Provide NFRC fenestration product ratings for the U-factor and the SHGC values of the skylights and doors on COMcheck or use the appropriate default U-factor and SHGC values from Tables C303.1.3 (1), C303.1.3 (2) and C303.1.3.(3), IECC 2012. Reference: Section C303.1.3, IECC 2012. 3. Show the size, routing, and termination of the drain for the evaporative cooler. Reference: Section 307.2.1, IMC 2012 as amended by the City of Tucson. 4. Provide sufficient heat for the restroom to maintain a minimum temperature of 68 F on a design heating day (32 F). Reference: Section 309.1, IMC 2012. 5. Provide the size of the door grilles (not shown on the architectural drawings). Reference: Section C403.3.1.1.4, IECC 2012. |
| 12/03/2014 | KEN VAN KARSEN | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | T14CM07504 1. Show the location of Panel LD on the Electrical Power Plan or site plan. 2. Show consistent Panel LD remarks notation on the panel schedule and one line diagram. Clarify replacement and enclosure type. Ken Van Karsen Electrical Plan Review PDSD, City of Tucson 520-837-4906 Kenneth.VanKarsen@tucsonaz.gov |
| 12/04/2014 | CPIERCE1 | WWM | REVIEW | Completed |