Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T14CM07355
Parcel: 11706187D

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T14CM07355
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/30/2014 STEVE SHIELDS ZONING REVIEW Denied PDSD Zoning Review Transmittal

TO: Planning and Development Services Department
Plans Coordination Office

FROM: Steve Shields
Lead Planner

PROJECT: T14CM07355
278 E. Congress Street

TRANSMITTAL DATE: October 30, 2014

Proposed Project: Permit Proposed Roof Tent Structure

COMMENTS:
DRB/RND review required due to exterior work on roof of structure.
No expansion of use area proposed.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov (520) 837-4956
10/30/2014 ERIC NEWCOMB MECHANICAL-COMMERCIAL REVIEW Passed
10/30/2014 ERIC NEWCOMB ELECTRICAL-COMMERCIAL REVIEW Passed
10/30/2014 ENEWCOM1 WATER REVIEW Passed
10/30/2014 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEET a1.0; BUILDING CODES: REVISE ALL BUILDING CODES TO THE CURRENT CITY OF TUCSON EDITIONS.
2. SHEET a1.0; PROJECT DATA: IT APPEARS THE OCCUPANCY LOAD FOR THIS PROJECT IS 187. A STATEMENT IS THEN MADE FOR 278 TOTAL OCCUPANTS. WHERE DOES THIS NUMBER COME FROM? INDICATE ON THE DRAWINGS.
3. SHEET a1.0 (PROJECT DATA); SHEET a1.2 (DECK PLAN): IS THE SCALE ON THE DECK PLAN CORRECT? VERIFY. THE AREA LISTED DOES NOT MATCH THIS SCALE.
4. SHEETS a1.1 AND a1.2; FLOOR PLAN: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE THE DIAGONAL DISTANCE DIMENSIONS.
5. SHEET a3.0; ROOF PLAN: SEE NOTE 3.
6. SHEET a6.0: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE THE ELEVATIONS VERBIAGE.
7. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
10/30/2014 ENEWCOM1 WWM REVIEW Passed
10/30/2014 ERIC NEWCOMB PLUMBING-COMMERCIAL REVIEW Passed
10/30/2014 LOREN MAKUS ENGINEERING REVIEW Approved
10/30/2014 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
11/05/2014 KEN BROUILLETTE FIRE REVIEW Denied SEE REDLINE CORRECTIONS ON PLANS-KRB