Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM07066
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/21/2014 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
10/21/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Verify that the HVAC unit controls have been provided with an automatic start capability. Reference: Section C403.2.4.3.3, IECC 2012. 2. Show that each heat pump meets the requirements of Section C403.3.1 (economizers) unless exempted by compliance with the efficiency requirements of Table C403.3.1 (2), IECC 2012. 3. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. 4. Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted. The supply air shall be exhausted even if the lights are off during occupied hours. Reference: Section 403.2.1 (4), IMC 2012. 5. Provide exhaust for the fitting room. Reference: Section 403.3, IMC 2012. |
10/21/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Plan review has been completed and the following corrections are required. Please provide a written response to comments with plan re-submittal. 1) Exhaust Fans 1 and 2 are shown interlocked with light switch/occupancy sensor. They must also be interlocked with AHU 3. An alternative is to have the fans run continuously during working hours. Reference IMC 403.2.1 If there are questions regarding this review contact: LeeRay 520-837-4906 LeeRay.Hanly@tucsonaz.gov |
10/21/2014 | ROBERT SHERRY | WATER | REVIEW | Completed | |
10/21/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET A1.0; CONSTRUCTION PLAN: PROVIDE A NORTH ARROW ON THE PLAN. 2. SHEET A5.1; SECTIONS 1 AND 2: PROVIDE SIZES OF BRACING, BEAMS, AND FRAMING, INCLUDING CONNECTIONS (SIZE AND QUANTITY). 3. SHEET A8.0; TYPICAL SECTIONS: PROVIDE STRUCTURAL CALCULATIONS AND DETAILS FOR THE SUPPORT OF THE WATER HEATER. 4. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
10/21/2014 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
10/21/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide tempered water for the restroom lavatories using approved devices conforming to ASSE 1070 (see Item M in the General notes, P2.0). Reference: Sections 416.5 and 607.1.2, IPC 2012. 2. Provide automatic faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson. 3. Correct the water riser diagram to coordinate with the water heater detail with respect to the valves located between the water heater and the expansion tank. 4. Provide cleanouts for all horizontal drains; the cleanouts shall be sized per Section 708.7, IPC 2012 and shall open to allow cleaning in the direction of flow. Reference: Sections 708.3.1 and 708.5, IPC 2012. |
10/21/2014 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
10/21/2014 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
11/04/2014 | SPOWELL1 | WWM | REVIEW | Needs Review |