Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T14CM07050
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/24/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | PREVIOUS COMMENT 9 SHEET 3a1.0 1. Provide a large scale detail of the new ramp showing all accessible requirements including grade differences, dimensioning, slope, handrails in plan and elevation and landings. a. Reference the large scale detail from detail 1/3a1.0. PREVIOUS COMMENT 13 SHEET 3a6.0 2. Note 7.15 is pointing at the new steel bond beam which references the roof system. Provide another note referencing the steel bond beam to detail 3/a9.3. a. At details 1 and 2/3a6.1, shouldn't the bond beam be shown on these two building sections? PREVIOUIS COMMENT 16 3. In the structural engineer's separate letter, he indicates the certification is attached to this submittal. It is not to be found. END OF REVIEW |
| 11/24/2014 | MICHAEL ST. PAUL | ZONING | REVIEW | Reqs Change | Final approval of DP14-0177 is required. |
| 12/09/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Clarify the roof and wall construction. The building sections do not identify the R-value of any of the cavity insulation. The wall sections do not identify any continuous insulation. [Initial comment: Revise the energy code analysis for the building envelope, coordinating the roof insulation used in the analysis with those shown on the drawing (e.g. no R-values for cavity insulation and no continuous insulation layers were shown on the building sections or details). Reference: Section C303.1, IECC 2012, as amended by the City of Tucson.] |
| 12/09/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Revise the structural calculations using the actual weight of the water heater: 100 lb for the water heater plus 250 lb for the 30 gallons of water. Verify that the stud wall will not buckle. [Initial comment: Provide structural calculations for the mounting shelf for the water heater to show that the water heater will be safely supported from the building structure. Reference: Section 301.2, IPC 2012.] |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/16/2014 | SHANAE POWELL | OUT TO CUSTOMER | Completed |
| 12/16/2014 | CPIERCE1 | REJECT SHELF | Completed |