| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/27/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | Reference Activity Number T14CM07048 for comments |
| 10/30/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
| 10/31/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide structural calculations for the mounting shelf for the water heater to show that the water heater will be safely supported from the building structure. Reference: Section 301.2, IPC 2012. 2. The rim elevation of the next upstream sanitary manhole (2908.97') is less than 12" below the first floor elevation (2909.00'). Provide a backwater valve per Section 715.1, IPC 2012, as amended by the City of Tucson. |
| 10/31/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 10/31/2014 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 10/31/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide NFRC fenestration product ratings for the insulated metal swinging doors for the U-factor on COMcheck or use the appropriate default U-factor values from Table C303.1.3.(2), IECC 2012. Reference: Section C303.1.3, IEC 2012. 2. Revise the energy code analysis for the building envelope, coordinating the roof insulation used in the analysis with those shown on the drawing (e.g. no R-values for cavity insulation and no continuous insulation layers were shown on the building sections or details). Reference: Section C303.1, IECC 2012, as amended by the City of Tucson. 3. Clarify the specified EER for heat pump HP2-1 with regard to the Mechanical Compliance Certificate. The unit is scheduled to have a minimum EER of 12.0 but Table C406.2(2), IECC 2012 calls for either a SEER of 12.0 or an EER of 12.4. 4. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. |
| 11/03/2014 | MICHAEL ST. PAUL | ZONING | REVIEW | Reqs Change | Approval of DP14-0177 required. |
| 11/03/2014 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/18/2014 | AROMERO4 | OUT TO CUSTOMER | Completed |