Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T14CM06779
Parcel: 124082240

Address:
50 N MOUNTAIN AV

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T14CM06779
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/08/2015 RONALD BROWN BUILDING-COMMERCIAL REVIEW Approved
01/15/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Comment not resolved; see Table E103.3 (2), IPC 2012 for the public fixture units. Use the total column when determining the building demand. [Second comment: Revise the fixture units used in the fixture schedule to those for public fixtures.] [Initial comment: The term "private" for plumbing fixtures applies to fixtures that are located in a residence or apartment, non-public toilet rooms in hotels or motels, and are intended for the use of a family or an individual. The plumbing fixtures shown in this design are all "publicĀ“ Reference: Section 202, IPC 2012.]
2. An approved 2-way cleanout fitting is allowed to be used at the junction of a building drain and a building sewer; otherwise, cleanouts shall open to allow cleaning in the direction of flow (i.e. one-way cleanouts only). Reference: Sections 708.3.5 and 708.5, IPC 2012. [Second comment: Show the locations of the required cleanouts for the building sewer.] [Initial comment: Provide a site drawing showing the size, route, and slope of the building sewer and the location of its connection to the public sewer. Reference: Section 107.2.1, IBC 2012.]
3. A waste stack shall not accept the discharge from water closets. The plumbing plan still doesn't agree with the isometric for the piping configuration and pipe sizes. The isometric also shows two floor drains located in the laundry room which doesn't agree with the plumbing plan. [Second comment: Coordinate the plumbing plans, the riser diagrams, and the fixture schedule to show the same fixtures and to identify all of the fixtures used. The waste and vent isometric shows incorrect use of waste stacks; see Section 913.4, IPC 2012.] [Initial comment: Provide complete plumbing plans for the new work, including plumbing floor plans for each floor, water isometrics and waste and vent isometrics. Reference: Section 107.2.1, IBC 2012.]
4. Material standards have not been provided for most of the plumbing fixtures (Fixtures P-5, P-7, and P-8 are the exceptions which have manufacturer's model numbers provided). [Second comment: Coordinate the fixture schedule with the drawings and include the material standards (3rd Party listing) for each fixture.] [Initial comment: Provide fixture descriptions and material standards for all plumbing fixtures. Reference: Section 402, IPC 2012 and Section 107.2.1, IBC 2012.]
5. It is not clear that this has been done because the isometric and plumbing plans do not agree. [Second comment: Revise the design appropriately.] [Initial comment: Horizontal branches shall connect no closer than ten diameters downstream of the bases of vertical stacks. Reference: Section 704.3, IPC 2012.]
6. It is not clear that this has been done because the isometric and plumbing plans do not agree. [Second comment: Comment not addressed.] [Initial comment: Clarify how the mop sink in the laundry room is to be vented. Reference: Section 901.2.1, IPC 2012.]
01/20/2015 KEN VAN KARSEN ELECTRICAL-COMMERCIAL REVIEW Completed
01/28/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. The submitted manufacturer's cut sheet for a sliding window has U-values that were applied to the sliding doors in the COMcheck analysis and a second cut sheet for windows has U-values and SHGC numbers that were not shown on the COMcheck analysis. [Second comment: NFRC fenestration product rating certification numbers were not used; use the default values for the U-values and the SHGC values.] [Initial comment: Provide NFRC fenestration product ratings for the U-factor on COMcheck or use the appropriate default U-factor from Tables R303.1.3 (1) or R303.1.3 (2), IECC 2012. Show the required U-factors for the vertical glazing on the drawings. Reference: Section R303.1.3, IEC 2012.
2. The note on the drawing points to either a duct or a range; clarify the note. [Second comment: Not found.] [Initial comment: Show the size, routing, and termination of the condensate drains. Reference: Section 307.2.1, IMC 2012 as amended by the City of Tucson.]
3. The note on the drawing points to a duct; clarify the note. [Second comment: Not found.] [Initial comment: Provide auxiliary drain pans or secondary drain systems for fan coil units. Reference: Section 307.2.3 IMC 2012.]