Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM06598
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/07/2014 | AROMERO4 | WWM | REVIEW | Completed | |
| 10/08/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 10/10/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
| 10/10/2014 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Clarify the demand served by water meters 1 and 2: what is the size of each meter (i.e. is water meter #1 a 1" or a 1-1/2" meter?), what type of system do they serve (predominantly tank or flush valve), and what is your calculated demand for each meter? Tucson Water limits 1" water meters to a maximum demand of 37.5-GPM and 1-1/2" water meters to a maximum demand of 75-GPM. Verify that the existing water meters are not under-sized. |
| 10/10/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Show how the temperature of the hot water supply to the lavatory in the new holding room is to be controlled. Reference: Sections 416.5 and 607.1, IPC 2012 and Section C404.3, IECC 2012. 2. The specified temperature mixing valve for fixture P1, Watts model L111, is an obsolete product that was listed as conforming to ASSE 1069 and ASSE 1070, not ASSE 1016 (it also conflicts with the mixing valve noted in detail 202). Revise the specifications to provide a currently-listed product that conforms to the correct ASSE standard so that an incorrect mixing valve is not substituted. Reference: Sections 416.5 and 607.1.2, IPC 2012. 3. Room 79 (Alien Processing) shows a hose bibb supplied with hot water but this hose bibb is not shown in either fixture schedule. Include this hose bibb in the appropriate demand calculation. Reference: Section 604.3, IPC 2012. 4. Keynote 4 on sheet A-9 calls for the relocation of a drinking fountain. Where is it shown on the plumbing drawings? |
| 10/10/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide notes 3, 4, and 5 for the ductless heat pump schedule. Reference: Section 107.2.1, IBC 2012. 2. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project (HP-1, HP-2, and DAC-1). Reference: Sections C403.2.1 and C403.2.2, IECC 2012. 3. Provide calculations for the Weapons room (106) to show that the ventilation system is sized in accordance with Section 403.3, IMC 2012. 4. Room 25 (Fitness) appears to have a significantly different occupancy type. Verify that the room has adequate ventilation for it new use. Reference: Section 403.3, IMC 2012. |
| 10/13/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | GENERAL COMMENT: As per the code reference on sheet SP-1 to the 2012 IBC was indicated, an accessible review was conducted using Chapter 11, 2009 ICC A117.1 accessible requirements. If a 2010 ADASAD review is required for this project beacuse this is a federal government agency, please apply for an appeal to the building official, Mr. Jim Vogelsberg. Coordinate all applications through Ms. Angie Ruiz, (520) 837-4896. SHEET SP-1 1. As per the 2012 IBC, Section 3411.7, Exception 2, not more than 20% of the costs shall be accessible requirements. Provide a cost analysis showing amount allotted for accessibility changes. 2. Show all accessible parking as required by Table 1106.1 of the 2012 IBC. SHEET A-1 3. Provide a large scale detailed floor plan showing all accessible requirements of HOLD 80 toilet room, showing all accessible requirements such as dimensioning, clearances, lav orientation, lav hardware and it's location, grab bars, seating and etc. Show access to the lav and how it meets code requirements. 4. As per the 2009 ICC A117.1, Section 904, Service Counters and Windows shall have a parallel or foward approach with a 36" high counter and width as per approach type. Revise the reception window counter accordingly. 5. Insure door 23 has the proper clearances as required by Section 404.2.3.2 figure (a). Show required clearance dimensions. 6. Provide title numbers on each detail on sheet A7 and reference the two breakroom counters to their respective elevations. 7. Toilet HCT 29 details shown on sheet A-1 are also shown on sheet A-7 as HCT 20. Room 20 is a corridor. Delete one set of these details and reference the toilet plans accordingly. 8. Toilet HOLD 80 details shown on sheet A-1 are also shown on sheet A-7. Delete one set of these details and reference the toilet plans accordingly. Provide the lavatory detail. SHEET M3 9. Provide structural details and calculations for all new roof top mounted and all structurally suspended HVAC equipment. END OF REVIEW |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/24/2014 | AROMERO4 | APPROVAL SHELF | Completed |
| 10/24/2014 | AROMERO4 | OUT TO CUSTOMER | Completed |
| 10/24/2014 | CPIERCE1 | REJECT SHELF | Completed |