Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM06525
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/02/2014 | AROMERO4 | WWM | REVIEW | Completed | |
10/03/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
10/03/2014 | ROBERT SHERRY | WATER | REVIEW | Completed | |
10/03/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Plan review has been completed and the following corrections are required. Please provide a written response to comments with plan re-submittal. 1) Provide lumen calculations for all exterior luminaires on the site (lumens / acre) in accordance with the City of Tucson Outdoor Lighting Code. 2) Exterior luminaires are limited to 3500K color temperature. Plans indicate 4000K fixtures. 3) EF1 in restroom may be switched with a programmable timer or interconnected with the AC. If there are questions regarding this review contact: LeeRay 520-837-4906 LeeRay.Hanly@tucsonaz.gov |
10/03/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating and cooling load calculations that justify the capacity of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. 2. Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restrooms will be exhausted. Reference: Section 403.2.1 (4), IMC 2012. 3. Revise the mechanical design as required to avoid using the corridor as a return air duct. Reference: Section 601.2, IMC 2012. |
10/03/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | |
10/03/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the size of the water distribution piping to limit the water velocity to less than 8 FPS. Use the water fixture units from Table E103.3(2), 2012 IPC. If PEX is to be used, show the sizes that will be required for PEX also. 2. Provide a cleanout at the juinction of the building drain and the building sewer. |
10/03/2014 | RONALD BROWN | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
10/17/2014 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
10/17/2014 | SPOWELL1 | ZONING | REVIEW | Needs Review |