Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM06300
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/24/2014 | CPIERCE1 | WWM | REVIEW | Completed | |
09/24/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
09/30/2014 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Reqs Change | Plan review has been completed and the following corrections are required. Please provide a written response to comments with plan re-submittal. 1) PP T0.0 multiple references in Project Data & Code Check indicate tables and sections of the IBC that do not correspond to the actual 2012 IBC book. Either remove the references or correct them. 2) PP A0.0 minimum font size for COT recordation process is 3/32" for both lower and upper case lettering. Rework the page. 3) PP A1.1 Provide thermal envelope compliance information to justify the R-30 batt insulation being installed in ceiling. Ref: 2012 IECC table C402.2 4) PP A3.0 a) Clarify purpose of detail 2. Are these seismic wires or support wires (note that seismic wires are not required in this zone). b) Provide ceiling installation detail rather than reference to CISCA c) Clarify joist material type for the type B ceiling. 5) G1 & G2 Remove details not used for this project. Standard details shall comply with 2009 ANSI 117.1. 6) Errata: pp E1.0 references the 2006 IECC rather than the 2012, pp E2.0 has 60A breaker on 1-line protecting feed to transformer but panel schedule calls for 70A breaker If there are questions regarding this review contact: LeeRay 520-837-4906 LeeRay.Hanly@tucsonaz.gov |
09/30/2014 | LHANLY1 | WATER | REVIEW | Completed | |
09/30/2014 | LEERAY HANLY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
09/30/2014 | LHANLY1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
09/30/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
09/30/2014 | LEERAY HANLY | MECHANICAL-COMMERCIAL | REVIEW | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/03/2014 | CPIERCE1 | OUT TO CUSTOMER | Completed |
10/03/2014 | CPIERCE1 | REJECT SHELF | Completed |