| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/06/2014 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
| 11/14/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 11/24/2014 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | Development plan must be approved first. Over-the-counter review and approval once DP is approved. |
| 11/25/2014 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Certex T14CM05980 Building Plan (2nd Review) TRANSMITTAL DATE: November 25, 2014 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning has reviewed the building plans but cannot approve until a development package has been approved. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
| 11/25/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The specified faucet is not listed as conforming to ASSE 1070; provide a mixing valve that will deliver tempered water as required. [Initial comment: Provide tempered water for the lavatories and public hand-washing sinks in restrooms using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012.] |
| 12/01/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Comment not addressed. [Initial comment: Provide energy code compliance calculations (e.g. COMcheck) for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation, the NFRC fenestration product ratings, and the SHGC for the fenestration. Reference: Sections C103.2, C303.1.3 (1), C303.1.3 (2), and C401.2, International Energy Conservation Code 2012.] |
| 12/02/2014 | KEN VAN KARSEN | ELECTRICAL-COMMERCIAL | REVIEW | Completed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/22/2014 | SHANAE POWELL | OUT TO CUSTOMER | Completed |
| 12/22/2014 | CPIERCE1 | REJECT SHELF | Completed |