Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM05279
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/14/2014 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 08/15/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1.Provide a mechanical plan. Show the location of the thermostat controlling this suite. 2. Show that the new restroom will be mechanically exhausted (i.e. there can be no return air from a restroom). |
| 08/15/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | 1) Show circuiting for required restroom exhaust 2) Clarify where electrical panels are. Show how separating out this suite will maintain compliance with NEC 24.24. |
| 08/15/2014 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Verify that the fixtures noted in the plumbing fixture schedule represent the total demand served by the existing water meter. (Note that a tank-type water closet has 5 WFU and a flush-valve water closet has 10 WFU.) |
| 08/15/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 08/15/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Specify the piping materials to be employed in this activity. Reference: Section 107.2.1, IBC 2012. 2. Provide fixture descriptions for all plumbing fixtures. Reference: Section 402, IPC 2012 and Section 107.2.1, IBC 2012. 3. Show the source of the hot water supply. Reference: Section 107.2.1, IBC 2012. 4. Show how the temperature of the hot water supply to the public lavatory is controlled. Reference: Sections 416.5 and 607.1, IPC 2012 and Section C404.3, IECC 2012. 5. Clarify the "extra" keynote #10 (next to keynote #8). |
| 08/15/2014 | CARL SCHULTZ | FIRE | REVIEW | Approved | |
| 08/15/2014 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 08/20/2014 | CPIERCE1 | WWM | REVIEW | Completed | |
| 08/20/2014 | LOREN MAKUS | ENGINEERING | REVIEW | Approved |