| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/11/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 08/12/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | GENERAL 1. Please provide structural details and calculations for : a. All Roof Top Mounted HVAC equipment b. Exhaust Hood 2. In the calculations, page 31 provides a flag pole foundation calculation. Could not find a flag pole on the site plan. Should this detail be for the light pole foundations shown on sheet E2.0? SHEET T1 3. Change the occupancy use to A3. 4. Add the patio occupancy load of 16 to the building occupancy load of 49 for a total load of 65. SHEET A1.1 5. What is the dark, poche'd, 4 section element in front of the display tacks with a referenced note #4. It does not appear to be doors as per note 4. Could it be the menu boards? Please clarify. SHEET A11 6. Provide vertical grab bars as required bu the 2009 ICC A117.1, Section 604.5.1 at details 1B and 2D. END OF REVIEW |
| 08/22/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | ALL CORRECTION COMMENTS ARE ERRATA RELATED AND DO NOT AFFECT CODE COMPLIANCE. 1) PP E4 -- LIGHT CONTROL PANEL SHOWN ROUTED TO B-32 WHICH IS A "SPACE" IN PANEL SCHEDULE 2) PP E4 -- OUTLET FOR "COOLATA" MACHINE IS ROUTED TO A-16, SHOULD BE A-40,42 3) PP E8. ALLOWABLE LUMENS IN OLC CHART DIDN'T PRINT INTO PLAN. |
| 08/25/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide the civil utilities plan showing the installation of the water service to the building, the construction of the building sewer, and the location of the connection to the public sewer. An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, site lighting, or electrical service to the building). 2. Verify the size of the cold water pipe between the water filter inlet and the water heater inlet. Reference: Section 604.1, IPC 2012. 3. Revise the partial waste and vent isometric to include the fixtures in room 105. Reference: Section 301.3, IPC 2012. 4. Revise detail A/P1.2 to clearly show the backflow prevention devices associated with each appliance. Reference: Sections 608.1 and 608.3, IPC 2012. 5. Clarify the size of the rainwater downspouts shown on roof plan 1/A4; 4" or 3"? Reference: Section 107.2.1, IBC 2012. 6. Provide the dimensions of the emergency overflow scupper. Reference: Section 1108.3, IPC 2012. |
| 08/25/2014 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide the site utility plan showing the location of the water meter and the reduced pressure backflow assembly. |
| 08/26/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012. 2. Revise the Mechanical Compliance Certificate to coordinate with the design of the HVAC system for the building (i.e. the design calls for three rooftop air conditioners with gas heat, not two rooftop air conditioners without heat). Reference: Section C303.1, IECC 2012, as amended by the City of Tucson. 3. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. |
| 08/26/2014 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera Principal Planner PROJECT: T14CM05139 Dunkin Donuts Building Plans TRANSMITTAL DATE: August 26, 2014 DUE DATE: September 8, 2014 COMMENTS: 01. Zoning has reviewed the building for compliance with the current version of the Development Package. Address the following items. 02. Revise the parking calculations on sheet T-1 to match the parking calculations on the DP. 03. The loading zone depicted on sheet SP-1 of the building plans is not allowed over the parking spaces. See UDC section 5.7.4.A Location and Use Requirements. If you have any questions about this transmittal, please call David Rivera, (520) 837-4957. |
| 08/27/2014 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering and Floodplain Review, 08/27/2014, The building plans shall be approved by Engineering and Floodplain Review after the the Development Package is approved by Zoning Review. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/29/2014 | CPIERCE1 | REJECT SHELF | Completed |