Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM04955
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/12/2014 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | DP must be approved first. |
| 08/13/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | GENERAL 1. Provide a new building addition code analysis to include: a. Occupancy load b. Toilet fixture requirements c. Public toilet room requirements d. Exit analysis e. Drinking fountains f. Mop sink 2. Please identify where on the structural drawings that 2x6s are called out for the exterior walls and parapet walls. 3. Provide completed form for certification of special inspectors. SHEET A2.0 4. Section reference F/A7.0 does not exist. 5. Finish detailing the ramp located on the south side of the building showing all accessible requirements such as dimensions, ramps, handrails on both sides of the ramp and their elevations, landings, slopes and grades. 6. Need 4'-0" clearance for passage between front entrances columns at three places. Verify with zoning this requirement. SHEET A4.0 7. Need structural calculations for all roof top mounted HVAC equipment. SHEET S2.1 8. Foundations F4 and F5 have no structural calculations. Please reconcile. END OF REVIEW |
| 08/13/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 08/14/2014 | RONALD BROWN | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
| 08/26/2014 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 08/28/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
| 09/02/2014 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 09/03/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Verify that the installation of the trap primer for the bathtub complies with the manufacturer's installation instructions (e.g. install near a fixture that creates a minimum of 10 PSIG pressure drop in the supply line). Reference: Section 303.2, IPC 2012. 2. Clarify the location of the connection of the water service for the addition to the existing water service pipe; a demand of 75 GPM requires the installation of a 2" pipe to keep the water velocity under 8 feet per second. Reference: Sections 303.2 and 604.1, IPC 2012. 3. The cleanout at the junction of the building drain and the building sewer is located upstream of the backwater valve. Verify with the manufacturer of the backwater valve that the backwater valve will not be damaged by drain cleaning attachments if the building sewer requires rodding. Reference: Section 303.2 IPC 2012. 4. State the minimum slope for the horizontal rainwater leaders. Reference: Section 1106.3, IPC 2012. |
| 09/03/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. 2. Provide NFRC fenestration product ratings for the U-factor on COMcheck or use the appropriate default U-factor from Table C303.1.3 (1), IECC 2012. Show the required U-factors for the vertical glazing on the drawings. Reference: Section C303.1.3, IEC 2012. 3. Provide NFRC fenestration product ratings for the Solar Heat Gain Coefficient (SHGC) on COMcheck or use the appropriate default SHGC from Table C303.1.3 (2), IECC 2012. Coordinate the SHGC values shown on the COMcheck Envelope Compliance Certificate with the window descriptions shown on the drawings (i.e. the required SHGC on the submitted COMcheck is 0.25 but it is "0.40 or lower" on sheet A11.0). Reference: Section C303.1.3, IEC 2012. 4. Revise the COMcheck Envelope Compliance Certificate to include the relocated emergency exit doors. Reference: Section C101.4.3, IEC 2012. 5. Revise the ventilation calculations for room 107 (Training Restroom) to show that the required exhaust ventilation is at least equal to the quantity of air supplied to the restroom. Reference: Section 403.2.1 (4), IMC 2012. |