Permit Number: T14CM04645
Parcel: 12801005H

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T14CM04645
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/30/2014 MARTIN BROWN FIRE REVIEW Approved
08/04/2014 RONALD BROWN BUILDING-COMMERCIAL REVIEW Reqs Change GENERAL
1. Please provide certification for any special inspectors as called for by the structural engineer. If no special inspections are required, please note so on Sheet A0.1.
2. Please provide structural calculations and details for the wall mounted water heater.
SHEET A0.2
3. Several of the details shown here are out dated and non compliant. Please delete this sheet or insure that all details comply with the 2012 IBC, Chapter 11 and the 2009 ICC A117.1.
SHEET A8.0
4. Show the vertical grab bar in both toilet rooms.
SHEET A8.1
5. Provide a vertical grab bar in detail 1.
END OF REVIEW
08/13/2014 ROBERT SHERRY WATER REVIEW Completed
08/13/2014 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that the seal shall have both a signature of the registrant and the date the document was sealed.
2. Provide automatic faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson.
3. Show the scheduled thermostatic mixing valves being installed to provide tempered water for the lavatories. Reference: Sections 416.5 and 607.1.2, IPC 2012.
4. Provide open-front water closet seats. Reference: Section 420.3, IPC 2012.
5. Provide an approved vacuum relief valve for the scheduled bottom-fed water heater which is located above the fixture outlets. Reference: Section 504.2, IPC 2012.
08/13/2014 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Completed
08/13/2014 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that the seal shall have both a signature of the registrant and the date the document was sealed.
2. Clarify the difference between the cooling load calculations and the cooling capacity of the proposed rooftop units. The cooling load calculations identify a total sensible load of 170.2 MBH but the total capacity of the scheduled units is 284.2 MBH. Reference: Section C403.2.2, IECC 2012.
3. Show that each rooftop unit has a thermostatic control that provides for off-hour and set-back control, automatic shutdown and start-up control and, if the control does not require manual changeover from the heating and cooling modes, restricts set point overlap. Reference: Section C403.2.4, IECC 2012.
4. Provide calculations demonstrating adequate ventilation using the 2012 International Mechanical Code. Reference: Section 403.2, IMC 2012.

Final Status

Task End Date Reviewer's Name Type of Review Description
09/11/2014 SHANAE POWELL OUT TO CUSTOMER Completed
09/11/2014 CPIERCE1 REJECT SHELF Completed