Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM04645
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/30/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
08/04/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | GENERAL 1. Please provide certification for any special inspectors as called for by the structural engineer. If no special inspections are required, please note so on Sheet A0.1. 2. Please provide structural calculations and details for the wall mounted water heater. SHEET A0.2 3. Several of the details shown here are out dated and non compliant. Please delete this sheet or insure that all details comply with the 2012 IBC, Chapter 11 and the 2009 ICC A117.1. SHEET A8.0 4. Show the vertical grab bar in both toilet rooms. SHEET A8.1 5. Provide a vertical grab bar in detail 1. END OF REVIEW |
08/13/2014 | ROBERT SHERRY | WATER | REVIEW | Completed | |
08/13/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that the seal shall have both a signature of the registrant and the date the document was sealed. 2. Provide automatic faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson. 3. Show the scheduled thermostatic mixing valves being installed to provide tempered water for the lavatories. Reference: Sections 416.5 and 607.1.2, IPC 2012. 4. Provide open-front water closet seats. Reference: Section 420.3, IPC 2012. 5. Provide an approved vacuum relief valve for the scheduled bottom-fed water heater which is located above the fixture outlets. Reference: Section 504.2, IPC 2012. |
08/13/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
08/13/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that the seal shall have both a signature of the registrant and the date the document was sealed. 2. Clarify the difference between the cooling load calculations and the cooling capacity of the proposed rooftop units. The cooling load calculations identify a total sensible load of 170.2 MBH but the total capacity of the scheduled units is 284.2 MBH. Reference: Section C403.2.2, IECC 2012. 3. Show that each rooftop unit has a thermostatic control that provides for off-hour and set-back control, automatic shutdown and start-up control and, if the control does not require manual changeover from the heating and cooling modes, restricts set point overlap. Reference: Section C403.2.4, IECC 2012. 4. Provide calculations demonstrating adequate ventilation using the 2012 International Mechanical Code. Reference: Section 403.2, IMC 2012. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/11/2014 | SHANAE POWELL | OUT TO CUSTOMER | Completed |
09/11/2014 | CPIERCE1 | REJECT SHELF | Completed |