Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T14CM04610
Parcel: 11520001N

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T14CM04610
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/22/2014 DAVID RIVERA ZONING REVIEW Approved
07/22/2014 JASON GREEN ENGINEERING REVIEW Approved
07/22/2014 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Completed
07/22/2014 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEET A2.0; FLOOR PLAN KEYNOTES: NOTE 7 WAS NOT LOCATED ON THE PLAN. VERIFY.
2. SHEET A2.0; WALL TYPES: PROVIDE A DETAIL ON THE DRAWINGS FOR BRACING AT THE TOP OF THE WALL. INCLUDE THE BRACING SIZE AND SPACING. INCLUDE THE CONNECTION (SIZE AND QUANTITY) OF THE BRACE TO THE TOP OF THE WALL AND TO THE EXISTING STRUCTURE ABOVE.
3. SHEET S0.0; STRUCTURAL NOTES (FOUNDATIONS): NOTE 1 SHOULD INDICATE THE ALLOWABLE SOIL BEARING PRESSURE OF 1500 PSF AT 18" BELOW NATURAL GRADE.
4. SHEET S2.0; FRAMING PLAN: DETAILS C/S2.1 AND E/S2.1 ON THE SOUTH WALL SHOULD BE REVERSED.
5. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
07/22/2014 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
07/23/2014 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012.
07/23/2014 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Clarify how the 1" CW will be connected to the waterless urinals. Reference: Section 303.2, IPC 2012.
2. If the shower does not have a pre-fabricated receptor, provide details to show that the construction of the receptor complies with the requirements of Section 417.5.2, IPC 2012.
3. Provide separate indirect waste pipes for each compartment of the 3-compartment sink and of the 4-compartment sink to protect against cross-contamination or fouling. Reference: Sections 801.2 and 802.1.8, IPC 2012.
07/23/2014 ROBERT SHERRY WATER REVIEW Completed
07/23/2014 MARTIN BROWN FIRE REVIEW Approved
08/29/2014 CPIERCE1 WWM REVIEW Needs Review