Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T14CM04541
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/03/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | Underground fuel tanks require separate, deferred submittal to the fire department. |
12/05/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | SHEET A503 1. Provide a 3'-0" wide accessible urinal stall as per 2009 ICC A117.1, Sections 605.3 and 305.7. SHEET S130 2. Side entrances framing plan in the calculations do not match those as per the roof framing plan on this sheet. 3. The calculations numbers on the steel beam key plan do not match the beam calculation numbers. 4. Calculations show ML4 and 5 but no ML1 through ML3. END OF REVIEW |
12/05/2014 | RONALD BROWN | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
12/15/2014 | JASON GREEN | ENGINEERING | REVIEW | Approv-Cond | Do not approve the building permit until both SEQ #'s are provided for the Covenants and the pedestrian access easement. |
12/18/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Show that the mechanical systems for the building comply with the current energy code, e.g. provide the COMcheck Mechanical Compliance Certificate. 2. Revise the insulation type for the exterior walls on the Envelope Compliance Certificate from "Continuous R-value" to "Cavity R-value". The Z-purlins form thermal bridges; continuous insulation is continuous over framing members or furring strips and is free of significant thermal bridging. 3. The vendor door (uninsulated single-layer metal, swinging) does not have an NFRC certification product rating and shall use the default U-factor from Table C303.1.3 (2), IECC 2012. Reference: Section C303.1, IECC 2012. 4. Identify the two envelope components labeled, "Flat Entry: steel-framed, 16" o.c." Reference: Section 107.2.1, IBC 2012. |
12/18/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Details A5/P512 and A13/P512 are referenced on sheet P104; should these call outs actually refer to details A9/P510 and A13/P510? 2. Coordinate the location of the primary roof drains and the overflow drains for the main roof with the slope of the roof and the crickets; the overflow drains are currently located below the primary roof drains. (Condensate drains that are currently shown terminating over what is labeled the overflow roof drain shall terminate over the primary roof drain.) Reference: Section 1108.1, IPC 2012 and Section 307.2.1 (3), IMC 2012, as amended by the City of Tucson. |
12/18/2014 | ROBERT SHERRY | WATER | REVIEW | Completed | |
12/23/2014 | KEN VAN KARSEN | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | T14CM04541 1. Single line diagram: a. Provide single line diagram with fault current identification from the calculation table, NEC 110.24. 2. Panel schedule information: a. Clarify the discrepancy between amperage entries shown on each panel and the Load Summary table. Example: panel T has 1,355 and 1,084 although the summary shows 1,502 and 1,069 Amps. 3. Clarify the lighting table on sheet E106 for City of Tucson Outdoor Lighting Code (Ord #10963) compliance: a. Provide the note 5 information referenced at fixture type M. b. Provide the lumen total for fixture type LED bands and update the total used lumens. Ken Van Karsen Electrical Plan Review PDSD, City of Tucson 520-837-4906 Kenneth.VanKarsen@tucsonaz.gov |
12/23/2014 | MICHAEL ST. PAUL | ZONING | REVIEW | Reqs Change | See condition in LHN by engineering. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/21/2015 | FERNE RODRIGUEZ | REJECT SHELF | Completed |