Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM04365
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/16/2014 | MARTIN BROWN | FIRE | REVIEW | Denied | This is a new submittal. Please remove prior approval stamps. All code references should indicate current adopted codes (2012 International Fire Code for the fire department) Certain information on plans (specifically, 100 sprinklers require monitoring) reference outdated codes. Please revise. |
07/24/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | SHEET A-1 1. Provide water dispensers as required by the 2012 IBC, Section 1109.5 and 2009 ICC A117.1, section 602. SHEET P-1 2. Provide structural details and calculations for the wall mounted water heater. SHEET H-1 3. Delete all ADA references and insure all accessible details are in compliance with the 1012 IBC, Chapter 11 and the 2009 ICC A117.1 4. Delete the middle of the door signage. This is no longer compliant. END OF REVIEW |
07/30/2014 | ROBERT SHERRY | WATER | REVIEW | Completed | |
07/30/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the font size used on the drawings to a minimum of 3/32-inch. Reference: Section 107.2.1, IBC 2012. 2. Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Reference: Section 107.2.1, IBC 2012. 3. Provide the minimum plumbing facilities required by Table 2902.1 and Section 2902.2, IBC 2012, for business occupancy (e.g. service sink, drinking fountain). 4. The fixture drain serving an automatic clothes washer shall connect to a fixture branch that is at least 3" in diameter. Reference: Section 406.2, IPC 2012. 5. Provide tempered water for the lavatories and public hand-washing sinks in restrooms using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012. 6. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves (e.g. clothes washers). Reference: Section 604.9, IPC 2012. 7. The developed length of the hot water supply piping appears to be greater than fifty feet; provide a method for maintaining the temperature of the hot water supply system. Reference: Section 607.2, IPC 2012. 8. Show how the water connections to each of the dental chairs are protected from backflow and cross contamination. Reference: Sections 608.1 and 608.3, IPC 2012. |
07/30/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the font size used on the drawings to a minimum of 3/32-inch. Reference: Section 107.2.1, IBC 2012. 2. Clarify which rooftop heat pumps are actually existing and serving the suites being modified. The approved drawings of the building and the 2014 aerial photographs show only two existing heat pumps - records show that the heat pump you call AC-1 is a 5-ton unit and the heat pump you call AC-2 is a 4-ton unit. If AC-3 has not been installed with a permit, it will be treated as if it is a new unit and will have to meet the current code requirements. A cooling/heating load calculation will be required to justify its use, its placement on the roof will have to be structurally evaluated, and the unit will have to be added to the electrical design. Reference: Section 107.2.1, IBC 2012. 3. Provide calculations demonstrating adequate ventilation using the current code. Reference: Section 403.2, IMC 2012. 4. Revise the mechanical design as required to avoid using the corridors as return air ducts. Reference: Section 601.2, IMC 2012. 5. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference: Section C403.2.7, IECC 2012. |
08/06/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Plan review has been completed and the following corrections are required. Please provide a written response to comments with plan re-submittal. 1) Provide electrical information for all equipment. (mechanical plans show 3 a/c units but only 2 are in panel schedule) ref: IBC 107.2.1 2) Panel schedule has not reproduced very well onto the plan sheet. Darken/clean-up for COT scanning purposes. If there are questions regarding this review contact: LeeRay 520-837-4906 LeeRay.Hanly@tucsonaz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/13/2014 | SHANAE POWELL | OUT TO CUSTOMER | Completed |
08/13/2014 | CPIERCE1 | REJECT SHELF | Completed |