Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM04331
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/17/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
| 07/18/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 07/22/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Please provide structural details and calculations for the following: a. All new roof top mounted HVAC equipment. b. All new light pole foundations. END OF REVIEW |
| 07/28/2014 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 07/28/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves (e.g. P1 and P2). Reference: Section 604.9, IPC 2012. 2. Verify the dimensions of the water heater closet and its door. The closet appears to be about 24" wide but is scheduled to have a 3'-0" door (door #204). Show how the specified water heater will be able to be maintained or replaced in the proposed water heater closet. Reference: Sections 501.4 and 502.5, IPC 2012. |
| 07/28/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. 2. Revise the mechanical design as required to avoid using the corridor as a return air duct (see HP-3 and HP-7). Reference: Section 601.2, IMC 2012. |