Permit Number: T14CM04237
Parcel: 14026002E

Address:
2000 E DREXEL RD

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T14CM04237
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/23/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Comment not resolved. The building drawings are not coordinated with the component descriptions used for COMcheck. Provide supporting documentation for the performance of the proposed fenestration (i.e. windows and doors); NFRC certification is required for fenestration components or the default values described in Sections C303.1.3 and R303.1.3, IECC 2012 must be used in COMcheck. Provide a COMcheck analysis for the residential portion on the building. [Initial comment: Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. The residential portion of the building and the commercial portion of the building shall be considered separately. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C101.4.5, C101.5, C103.2, C401.2, R101.4.6, R101.5, R103.2, and R401.2, International Energy Conservation Code 2012.]
2. Comment not resolved. The mechanical equipment specified in the mechanical drawing is not coordinated with the component descriptions used for COMcheck. [Initial comment: Show that the mechanical system of the commercial portion of the building complies with the requirements of Sections C403.2, C403.3 and, if neither the efficient lighting system nor the on-site renewable energy options are selected, C406.2, IECC 2012 (e.g. provide the mechanical energy code compliance certification from COMcheck). Reference: Section C303.1, International Energy Conservation Code 2012.]
3. The heating and cooling load calculations do not support the specified AC equipment. The specifications for the equipment are also incorrect (AC-1 total cooling capacity) or missing (AC-2). [Initial comment: Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1, C403.2.2, and R403.6, IECC 2012.]
4. Comment not addressed. [Initial comment: Provide the listing information for the specified rooftop AC unit. Verify the cooling and heating capacity of the rooftop AC unit. Reference: Section 301.7, IMC 2012 and R403.2.2.1, IECC 2012.]
5. The specification on the drawing in incomplete and the submitted cut-sheet does not apply to the specified equipment. [Initial comment: Provide the listing information for the specified, window-mounted (wall-mounted?) AC unit. Reference: Section 301.7, IMC 2012 and C403.2.3, IECC 2012.]
6. Comment not addressed. [Initial comment: Provide the listing information for the restroom and bathroom exhaust fans. Reference: Sections 301.7 and 403.3, IMC 2012.]
7. Comment not addressed. [Initial comment: Show the size, routing, and termination of the condensate drain for the rooftop unit. Reference: Section 307.2.1, IMC 2012 as amended by the City of Tucson.]
02/23/2015 ROBERT SHERRY WATER REVIEW Reqs Change 1. Comment not addressed; the drawings have not been changed. [Initial comment: Verify the size of the water meter serving the new office building: the site plan shows a 2" service with a 1-1/2" meter as compared to the 1" service and 1" meter shown on the plumbing plan.]
2. Comment not addressed. [Initial comment: Verify that Tucson Water will not be requiring the installation of a backflow preventer for this property.]
02/23/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Comment not addressed. [Initial comment: Coordinate the waste and vent diagram with the waste and vent piping shown on the plumbing plan. Reference: Section 107.2.1, IBC 2012.]
2. Comment not addressed. [Initial comment: Coordinate the size of the building sewer with the site plan: 4" or 3"? Reference: Section 107.2.1, IBC 2012.]
3. Comment not addressed. [Initial comment: Provide fixture descriptions for all plumbing fixtures. Reference: Section 402, IPC 2012 and Section 107.2.1, IBC 2012.]
4. Comment not addressed. [Initial comment: Provide shower and tub/shower control valves that comply with the requirements of Sections 424.3 and 424.5, IPC 2012.]
5. Comment not addressed. [Initial comment: If the specified water heater is not supplied with integral heat traps, provide heat traps on the supply and discharge piping. Reference: Section C404.4, IECC 2012.
6. Comment not resolved. Specify the "temperature limiting mixing valve" and clarify how it is to be installed. Show how the temperature of the water supply system is to be maintained (see comment below). [Initial comment: Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, vacuum relief or other anti-siphon device, safety pan, and valves. Reference: Sections 503, 504, 606.1, 607.2, and 607.3, IPC 2012.]
7. Comment not addressed. [Initial comment: Provide a full-open valve for the water service at the building entrance. Reference: Section 606.1(2), IPC 2012.]
8. Comment not addressed. [Initial comment: The developed length of the hot water supply piping appears to be greater than fifty feet; if so, provide a method for maintaining the temperature of the hot water supply system. Reference: Section 607.2, IPC 2012.]
9. Comment not addressed. [Initial comment: Coordinate the roof drawing with the building elevations; clarify the locations of the scuppers. Reference: Section 107.2.1, IBC 2012.]
02/24/2015 RONALD BROWN BUILDING-COMMERCIAL REVIEW Approved
04/23/2015 KROBLES1 ENGINEERING REVIEW Needs Review
04/23/2015 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
04/23/2015 KROBLES1 ZONING REVIEW Needs Review