Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T14CM04139
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/08/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 08/08/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
| 08/11/2014 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide an appeal to the building official for approval of the use of a balancing valve and an expansion tank to emulate the demand of a flush tank system as an alternative engineered design. Reference: Section 316.1, IPC 2012. [Initial comment: This suite is served by a 1" water meter and Tucson Water limits a 1" water meter to a maximum demand of 37.5 GPM. The water service demand appears to be far in excess of 37.5 GPM. Evaluate the water demand and make the appropriate modifications to either reduce the demand or increase the size of the meter.] |
| 08/11/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide an appeal to the building official for approval of the use of a balancing valve and an expansion tank to emulate the demand of a flush tank system as an alternative engineered design. Reference: Section 316.1, IPC 2012. [Initial comment: Verify that the water in the service pipe will not exceed 8 FPS for the calculated water demand. Include all fixtures and water-connected appliances when calculating the total demand and determining pipe sizes. Reference: Sections 303.2 and 604.3, IPC 2012.] |
| 08/11/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed |