Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM03626
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/13/2014 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 06/13/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide thermal load and HVAC equipment-sizing calculations to confirm the specified heat pumps for each apartment type. Reference: Section R403.6, IECC 2012. 2. Specify the required U-factors and Solar Heat Gain Coefficients (SHGC) for the new windows on the architectural drawings. Reference: Section R303.1.3, IECC 2012. |
| 06/13/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
| 06/13/2014 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 06/13/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 06/13/2014 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 06/13/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide material standards for all plumbing fixtures being provided by others. Reference: Sections 303.4 and 402, IPC 2012. 2. If the shower does not have a pre-fabricated receptor, provide details to show that the construction of the receptor complies with the requirements of Section 417.5.2, IPC 2012. 3. Provide shower and tub/shower control valves that comply with the requirements of Sections 424.3 and 424.5, IPC 2012. |
| 06/13/2014 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 06/16/2014 | LHANLY1 | WWM | REVIEW | Passed | |
| 06/16/2014 | KEN BROUILLETTE | FIRE | REVIEW | Approved |