Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM03598
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/12/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET A2.0; ELEVATION KEYNOTES: NOTES 6 AND 7 WERE NOT LOCATED ON THE ELEVATIONS. VERIFY. 2. SHEET A3.0; SECTION KEYNOTES: NOTES 13 AND 14 WERE NOT LOCATED ON THE SECTIONS. VERIFY. 3. SHEET A3.0; SECTION KEYNOTES: FINISH THE DETAIL NUMBER IN NOTE 16. 4. SHEET A3.0; SECTION 6: NOTE 22 REFERENCES A 2"X2"X3/16" STEEL ANGLE. PROVIDE A NOTE FOR THE CONNECTION OF THE ANGLE TO THE MASONRY. 5. SHEET A4.0; SECTION 10: PROVIDE A NOTE FOR THE CONNECTION OF THE 2"X2"X3/16" ANGLE TO THE METAL STUDS. 6. SHEET S1.1; ROOF FRAMING PLAN: REVISE THE NORTH ARROW DIRECTION. 7. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 06/12/2014 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 06/12/2014 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 06/13/2014 | SPOWELL1 | MECHANICAL-COMMERCIAL | REVIEW | Needs Review | |
| 06/13/2014 | SPOWELL1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
| 06/13/2014 | SPOWELL1 | WATER | REVIEW | Needs Review | |
| 06/13/2014 | SPOWELL1 | ZONING | REVIEW | Needs Review | |
| 06/13/2014 | SPOWELL1 | WWM | REVIEW | Needs Review | |
| 06/13/2014 | SPOWELL1 | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
| 06/13/2014 | SPOWELL1 | FIRE | REVIEW | Needs Review |