Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T14CM03575
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/13/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
06/30/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
06/30/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | SHEET L2 1. The PV Racking Detail and the panel section shows anchoring into the top of a TJI L65 top cord with 2~5/16" x 3.5" lag screws. The top cord of this TJI is 1.5" deep and 2.5" wide with a 7/16" thick web member inserted more than halfway into the middle of the cord. a. The lag screws are shown strattleing the top cord at a width which appears to be more then the top cord width of 2.5". Perhaps the bracket and bolt pattern should be parallel with the top cord? b. Please provide a structural detail from Caiman Engineering (signed and sealed) showing the exact configuration of the anchoring system he is proposing. In addition please provide a letter of approval of this detail from the truss manufacturer. END OF REVIEW |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/07/2014 | CPIERCE1 | OUT TO CUSTOMER | Passed |