Permit Number: T14CM03541
Parcel: 117050890

Address:
340 N 4TH AV

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T14CM03541
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/22/2014 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Place the detail on the drawing as requested. [Second comment: The letter from the structural engineer included specific directions for the installation of the hood; provide a detail on the drawing that shows how to install the hood supports.] [Original comment: Provide structural calculations and details to show that the Type I hood is supported from the building structure in accordance with Section 507.6, IMC 2012 (the hood hanging weight plus the weight of personnel working in or on the hood). Reference: Section 302.1, IMC 2012.]
07/22/2014 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Show that the gas meter is providing an initial pressure of 2 PSIG with an additional pressure regulator to reduce the downstream pressure to an acceptable pressure for the appliances. [Second comment: Based on a total developed length of 188 feet, the 200-foot column of Table 402.4 (2) must be used for the main pipe run. At a total load of 752 CFH, a 2" pipe is required. Similarly, the pipe serving both existing rooftop units (180 CFH) needs to be 1-1/4" and the main pipe section between the water heater and the kitchen appliances (553 CFH) is to be 2".] [Original comment: Correct the gas pipe sizing calculations, demonstrating conformance to Section 402.1 and 402.3, IFGC 2012.]
2. The letter from Pima County only identifies four fixtures; reconfirm the design with Pima County. [Second comment: Provide a record copy of the letter from the Pima County Regional Wastewater Reclamation Department allowing the six fixtures to be connected to a hydromechanical grease interceptor. [Original comment: The drawings indicate that six fixtures (4 floor sinks, 1 hand sink, and 1 mop sink) are connected to the hydromechanical grease interceptor. Verify that the Regional Wastewater Reclamation Department will allow this. Reference: Section 1003.3, IPC 2012, as amended by the City of Tucson.]
07/24/2014 CPIERCE1 BUILDING-COMMERCIAL REVIEW Needs Review