Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM03540
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/10/2014 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
06/10/2014 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
06/11/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
06/11/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. 2. Provide structural details to show how the fan coil unit is to be connected to the building structure. Reference: Section 302.1, IMC 2012. 3. Provide the kiln manufacturer's equipment data and installation instructions for the new kilns. Reference: Sections 301, 304.1, and 923.1.1, IMC 2012. 4. Provide listing information for the CPVC exhaust duct. Reference: Sections 301, and 304.1, IMC 2012. 5. Clarify the location of the exhaust discharge for the kilns relative to walk ways and building openings. Reference: Sections 501.3.1 and 501.3.1.1, IMC 2012. 6. Verify that there is adequate make-up air (supply air, transfer air, or outside air) for the kiln exhaust to maintain the room with a neutral or slightly negative pressure. Reference: Section 501.4, IMC 2012. 7. Verify that the exhaust duct is not located within a return air plenum. Reference: Sections 601.4 and 602.2.1, IMC 2012. |
06/11/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
06/11/2014 | ROBERT SHERRY | WATER | REVIEW | Approved | |
06/11/2014 | MARTIN BROWN | FIRE | REVIEW | Denied | Please provide cut sheets and manufacturer's instructions for kilns. |
06/11/2014 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
06/12/2014 | LHANLY1 | WWM | REVIEW | Passed | |
06/12/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed |