Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T14CM03341
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/05/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET T1.0; CODE REVIEW CHECKLIST: THE ACCESSIBILITY CODE LISTS THE 2003 EDITION OF THE ANSI A117.1. REVISE TO THE 2009 EDITION. 2. SHEET T1.0; REQUIRED PLUMBING FIXTURE CALCULATION: REVISE THE FEMALE WATER CLOSET CALCULATION FROM 3373 TO 373. 3. SHEET T1.0 (REQUIRED PLUMBING FIXTURE CALCULATION); SHEET A1.0 (PLUMBING FIXTURE CALCULATION): SHEET T1.0 INDICATES 4 DRINKING FOUNTAINS ARE PROVIDED, WHILE SHEET A1.0 INDICATES 7 DRINKING FOUNTAINS PROVIDED. CLARIFY. 4. SHEET T1.0; INDEX TO DRAWINGS: INCLUDE SHEET T1.0 IN THE INDEX. 5. SHEET T1.0 (INDEX TO DRAWINGS); SHEET S3.1: THE INDEX ON T1.0 AND THE DRAWING TITLE ON S3.1 INDICATE FOUNDATION PLAN. THE SHEET IS A ROOF FRAMING PLAN. REVISE. 6. SHEET D1.0: DARKEN THE LINE QUALITY OF THE EXISTING PLAN AND PARKING LOT. 7. SHEET D1.0; DEMOLITION PLAN KEYNOTES: NOTES 2, 3, AND 5 WERE NOT LOCATED ON THE PLAN. VERIFY. 8. SHEET D2.0; CEILING PLAN KEYNOTES: REMOVE NOTE 3 CONCERNING THE FLAG POLE (THIS IS ADDRESSED ON SHEET D1.0). 9. SHEET A1.0; LIFE SAFETY PLANS: HOW ARE THESE LIFE SAFETY PLANS SINCE NO EGRESS OR EXITING IS INDICATED? CLARIFY. 10. SHEET A1.0; OCCUPANT LOAD CALCULATION: APPROVAL FOR THE REDUCED OCCUPANT LOAD REQUIRES AN APPEAL TO THE BUILDING OFFICIAL. HAS THAT BEEN SUBMITTED? 11. SHEET A3.0; REFLECTED CEILING PLAN KEYNOTES: NOTE 7 WAS NOT LOCATED ON THE PLAN. VERIFY. 12. SHEET A3.0; EXTERIOR WINDOW ASSEMBLY KEYNOTES: NOTE 9 WAS NOT LOCATED ON THE DETAIL. VERIFY. 13. SHEET A3.0; REFLECTED CEILING PLAN: REMOVE NOTE 12 CONCERNING THE FLAG POLE (THIS IS ADDRESSED ON SHEET A2.0). 14. SHEET A6.0; SECTION KEYNOTES: NOTE 17 WAS NOT LOCATED ON THE SECTIONS. VERIFY. 15. SHEET A7.0; ELEVATION KEYNOTES: NOTE 2 WAS NOT LOCATED ON THE ELEVATIONS. VERIFY. 16. SHEET A9.0; RESTROOM KEYNOTES: NOTES 3, 4, AND 6 WERE NOT LOCATED ON THIS SHEET. VERIFY. 17. SHEET S2.1 (FOUNDATION PLAN); STRUCTURAL CALCULATIONS: NO CALCULATIONS WERE FOUND FOR THE COLUMNS AND FOOTINGS AT THE REAR BEAM AT THE ENTRY. PROVIDE. 18. SHEET S4.1; DETAIL 110: NO CALCULATIONS WERE FOUND FOR THE FLAGPOLE FOOTING. PROVIDE. 19. SHEET S4.1; DETAIL 106: INDICATE ON NOTE 7 THE MINIMUM EMBEDMENT LENGTH OF THE REINFORCING INTO THE EXISTING FOOTING. 20. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
06/05/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
06/06/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
06/06/2014 | ROBERT SHERRY | WATER | REVIEW | Completed | |
06/09/2014 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
06/09/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide information to show how the proposed water heater is to be supported from the building structure, i.e. any work requiring coordination with the structural engineer is to be shown on the plans and not left to the field personnel. Reference: Section 107.2.1, IBC and Section 301.2, IPC 2012. 2. Correct the water calculations: two hi-low drinking fountains are being installed; include the fixture units from the mop sink in the calculations, add the fixture units for the existing fixtures and the fixture units for the new fixtures to determine the total demand; compare the pipe sizing chart with the pipe sizes shown on the plumbing plan; and if PEX tubing is to be installed, show a separate pipe sizing chart for use with PEX. Reference: Section 107.2.1, IBC and Section 604.1, IPC 2012. 3. Verify the areas used for the roof drainage calculations and provide the detailed hydraulic calculations upon which the scupper sizes are based. Reference: Sections 1101 and 1106, IPC 2012. 4. Show the size, slopes, routing, and termination points for the roof drains, overflow roof drains, and the roof drain and overflow drain leaders for the porch. Reference: Sections 1106 and 1108, IPC 2012. |
06/09/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. 2. Show the size, routing, and termination of the condensate drains. Reference: Section 307.2.1, IMC 2012 as amended by the City of Tucson. 3. Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restrooms will be exhausted. Reference: Section 403.2.1 (4), IMC 2012. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/10/2014 | CPIERCE1 | OUT TO CUSTOMER | Completed |