Permit Number: T14CM03195
Parcel: 13323164A

Review Status: Completed

Review Details: RESUBMITTAL - TI ALL

Permit Number - T14CM03195
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/16/2014 JASON GREEN ENGINEERING REVIEW Reqs Change ENG can not approve the development plan package until approval of the DP Package DP14-0018. Provide a copy of the approved DP Package for building plan approval. JG
07/21/2014 RONALD BROWN BUILDING-COMMERCIAL REVIEW Approv-Cond 1. Separate permits are to be applied for all racking systems. 2. Separate permits are to be applied for all fire alarm systems/sprinkler systems to Fire Marshall.
07/25/2014 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change The City of Tucson did not adopt ASHRAE Standard 62.1 for ventilation calculations and the 2012 IMC only references the ASHRAE Standard for the purpose of calculating the system ventilation efficiency (Ev). Provide calculations to show that the ventilation system is sized in accordance with Section 403.3, IMC 2012. The occupant load used for calculating the minimum required ventilation is to be based on Table 403.3, IMC 2012 or an approved engineering analysis of the specific occupancy type (i.e. submit an appeal to the building official). [Initial comment: Provide calculations demonstrating adequate ventilation using the current code. Reference: Section 403.2, IMC 2012.]
07/25/2014 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
07/29/2014 STEVE SHIELDS ZONING REVIEW Denied PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Walmart Expansion - 7150 E. Speedway Blvd.
T14CM03195
Building Plan (2nd Review)

TRANSMITTAL DATE: July 29, 2014

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning has reviewed the building plans but cannot approve until development package, DP13-0230 has been approved.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
08/06/2014 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Reqs Change Original comments not addressed. Provide the information in the plan set for approval. You can reach TEP and request this information by calling 520- Reference IBC 107.2.1

"Provide available fault currents, and bracing information for new panels. Verify that existing equipment will be properly braced for new available fault currents"

Fault current calculations may be provided on separate cut-sheet and informtion filled in by hand for approval of this plan set.