Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM03109
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/27/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The plumbing fixture schedule shows two wall boxes (P4) to be installed, show their locations. |
05/27/2014 | ROBERT SHERRY | WATER | REVIEW | Approved | |
05/27/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | The glass notes on sheet A7.0 call for the exterior glass to have a U-factor of 0.50 and a SHGC of 0.25 but Section 3 of the Envelope Compliance Certification shows the exterior glazing with a U-factor of 0.200 and a SHGC of 0.23. Revise the either the energy code analysis for the building envelope or the glass notes on sheet A7.0, coordinating the building components used in the analysis with those shown on the drawing. Reference: Section C303.1, IECC 2012, as amended by the City of Tucson. |
05/28/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
06/09/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | GENERAL 1. Need to provide certification for special inspectors. 2. Not Used SHEET A0.1 3. Please calculate an occupancy load for the play room and add it to the overall occupancy load. a. Recalculate the exit requirements and plumbing fixtures count with this new larger occupancy load. 4. Change the Occupancy Classification as listed from A2 to A3 Community Hall. SHEET A9.0 5. At detail 4 change the lavatory counter height to 2'-10". SHEET S2.2 6. Provide a general set of performance specifications and include the required special inspections. a. A list of special inspections is included in the conditions section of this permit program. Please verify the list is correct and email any corrections that needs to be made. END OF REVIEW |
06/10/2014 | RONALD BROWN | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
06/16/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/20/2015 | SHANAE POWELL | OUT TO CUSTOMER | Completed |
02/20/2015 | CPIERCE1 | REJECT SHELF | Completed |