Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T14CM03073
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/21/2014 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
07/24/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | Reference comments on T14CM03072 |
08/04/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Verify the arithmetic of the water fixture unit calculations for water meter #4. Reference: Section 107.2.1, IBC 2012. 2. No specification sheets were included in this submittal but since the first check valve for a reduced pressure backflow preventer is required to have a 5 PSI pressure drop, it is unlikely that you will find a reduced pressure backflow preventer that has a 5 PSI pressure drop across two check valves and a reduced pressure zone. [Initial comment: The water pressure calculations include a 5 PSI pressure drop due to the reduced pressure backflow preventers. Provide specification sheets from the manufacturer that supports that pressure drop. Reference: Section 604.1, IPC 2012.] 3. Provide a copy of the approved appeal to the building official for this design. [Initial comment: Buildings not located on the same lot shall have separate sewer connections. Provide justification for connecting the grease waste from buildings located on separate lots and utilizing a common grease interceptor prior to connecting to the public sewer. The drawings indicate that up to ten different tenants could be sharing the same grease interceptor. Reference: Section 701.3, IPC 2012.] |
08/04/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide the basis used to size the equipment (i.e. the cooling/heating load calculations including the projected outside air quantities), or do not install the equipment. [Initial comment: Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012.] 2. Provide calculations to show that the mechanical equipment hanger detail (05/S1.1) is adequate for the specified equipment. [Initial comment: Provide structural details to show how the fan coil units are to be connected to the building structure. Reference: Section 302.1, IMC 2012.] 3. The plumbing drawings show only the primary condensate drains; show the secondary drain routing and terminations. [Initial comment: Show the size, routing, and termination of the secondary condensate drains. Reference: Section 307.2.1, IMC 2012 as amended by the City of Tucson.] |
08/07/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/20/2014 | AROMERO4 | APPROVAL SHELF | Completed |
08/20/2014 | AROMERO4 | OUT TO CUSTOMER | Completed |
08/20/2014 | CPIERCE1 | REJECT SHELF | Completed |