Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T14CM03072
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/20/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
08/21/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not addressed. [Second comment: No specification sheets were included in this submittal but since the first check valve for a reduced pressure backflow preventer is required to have a 5 PSI pressure drop, it is unlikely that you will find a reduced pressure backflow preventer that has a 5 PSI pressure drop across two check valves and a reduced pressure zone.] [Initial comment: The water pressure calculations include a 5 PSI pressure drop due to the reduced pressure backflow preventers. Provide specification sheets from the manufacturer that supports that pressure drop. Reference: Section 604.1, IPC 2012.] 2. The submitted letter will make a good addition to an appeal to the building official but I require a copy of an approved appeal to the building official. [Second comment: Provide a copy of the approved appeal to the building official for this design.] [Initial comment: Buildings not located on the same lot shall have separate sewer connections. Provide justification for connecting the grease waste from buildings located on separate lots and utilizing a common grease interceptor prior to connecting to the public sewer. The drawings indicate that up to ten different tenants could be sharing the same grease interceptor. Reference: Section 701.3, IPC 2012.] |
08/29/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Correct the envelope compliance certificate by including the north wall of the restroom facility. [Second comment: Comment not addressed; show that the building addition complies with the current energy code.] [Initial comment: Demonstrate energy code compliance for the addition to the building envelope using calculations based on the current code. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012.] |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/29/2014 | AROMERO4 | OUT TO CUSTOMER | Completed |